Difference between revisions of "Ichthys FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 16: | Line 16: | ||
=== Contractors === | === Contractors === | ||
− | + | * Daewoo Shipbuilding & Marine Engineering (DSME): Construction of FPSO hull | |
* **Technip:** Detailed engineering and procurement assistance for the topsides facilities | * **Technip:** Detailed engineering and procurement assistance for the topsides facilities | ||
* **Alfa Laval:** Condensate preheaters | * **Alfa Laval:** Condensate preheaters | ||
Line 22: | Line 22: | ||
** Fuel Gas H2S and Mercury Removal Package | ** Fuel Gas H2S and Mercury Removal Package | ||
** 3 x 672 MMSCFD TEG Dehydration Packages | ** 3 x 672 MMSCFD TEG Dehydration Packages | ||
+ | * Wärtsilä: supply of inert gas generator units | ||
=== Status === | === Status === | ||
Line 42: | Line 43: | ||
# [[Process Group Oil And Gas Processing References]] | # [[Process Group Oil And Gas Processing References]] | ||
+ | # [[Wärtsilä FPSO References]] | ||
# [http://killajoules.wikidot.com/blog:2676 Technip awarded contract for Ichthys FPSO unit] | # [http://killajoules.wikidot.com/blog:2676 Technip awarded contract for Ichthys FPSO unit] | ||
# [http://killajoules.wikidot.com/archive:construction-begins-on-last-major-offshore-facility Construction begins on last major offshore facility (FPSO) for Ichthys] | # [http://killajoules.wikidot.com/archive:construction-begins-on-last-major-offshore-facility Construction begins on last major offshore facility (FPSO) for Ichthys] |
Latest revision as of 07:27, 23 November 2023
Contents
Summary Information
- Name: Ichthys FPSO
- Field: Ichthys Gas Field
- Country: Australia
- Ownership: Inpex
- Website: http://www.inpex.co.jp/
- Operated By: Inpex
- Capacity: 100,000 bpd
- Year of Completion
Brief Description
- The FPSO is part of the Ichthys LNG Terminal. The vessel will be used for condensate dewatering, stabilisation, storage and export
- The vessel will be 336m by 59m and has production capacity of 100,000 barrels of gas condensate per day and 1.2 million barrels storage capacity
Contractors
- Daewoo Shipbuilding & Marine Engineering (DSME): Construction of FPSO hull
- **Technip:** Detailed engineering and procurement assistance for the topsides facilities
- **Alfa Laval:** Condensate preheaters
- **Process Group:**
- Fuel Gas H2S and Mercury Removal Package
- 3 x 672 MMSCFD TEG Dehydration Packages
- Wärtsilä: supply of inert gas generator units
Status
- In operation
History
- 2012 - Technip awarded topsides contract
- 2013 - Construction started
- 2013 - Alfa Laval awarded heater contract
- 2014 - Keel laying ceremony held
- 2015 - Topsides integration started
- 2018 - First gas production
Other Information
- -
Links
- Process Group Oil And Gas Processing References
- Wärtsilä FPSO References
- Technip awarded contract for Ichthys FPSO unit
- Construction begins on last major offshore facility (FPSO) for Ichthys
- Alfa Laval wins SEK 130 million offshore gas order in South Korea
- Ichthys LNG Project Celebrates FPSO Keel Laying
- Ichthys topsides integration starts with lifts
- INPEX-operated Ichthys LNG Project Celebrates Startup of Operations