Difference between revisions of "Whistler Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Source: Waha * Destination: Agua Dulce * Ownership: MPLX LP & WhiteWater Midstream * Website: * Length: kilometres (450 miles) * Capacity: 2...")
 
Line 13: Line 13:
  
 
=== History ===
 
=== History ===
* -  
+
* 2022 - FID for expansion project
  
 
=== Other Information ===
 
=== Other Information ===
Line 19: Line 19:
  
 
=== Links ===
 
=== Links ===
# []
+
# [https://abarrelfull.blogspot.com/2023/09/whistler-pipeline-expansion-reaches.html Whistler Pipeline expansion reaches final investment decision]
  
 
[[category:Pipeline]]
 
[[category:Pipeline]]
 
[[category:USA]]
 
[[category:USA]]
 
[[category:MPLX]]
 
[[category:MPLX]]

Revision as of 14:08, 21 September 2023

Summary Information

  • Source: Waha
  • Destination: Agua Dulce
  • Ownership: MPLX LP & WhiteWater Midstream
  • Website:
  • Length: kilometres (450 miles)
  • Capacity: 2 BCF per day
  • Status: Operating

Details

  • The Whistler pipeline is an approximately 450-mile, 42-inch diameter intrastate pipeline that transports natural gas from the Waha Header in the Permian Basin to Agua Dulce Natural Gas Hub, Texas, providing direct access to South Texas and export markets. An approximately 85-mile, 36-inch diameter lateral provides connectivity to the Midland Basin.

History

  • 2022 - FID for expansion project

Other Information

  • -

Links

  1. Whistler Pipeline expansion reaches final investment decision