Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Shell * Country: UK * Location: North Sea * Production start: 1994 * Partners: * Type: Oil & Gas * Estimated Reserves: * Production Volume:...") |
Abarrelfull (talk | contribs) |
||
Line 13: | Line 13: | ||
* The [[Bardolino Oil Field]] is tied back to the Nelson Platform | * The [[Bardolino Oil Field]] is tied back to the Nelson Platform | ||
* **Howe Oil Field** | * **Howe Oil Field** | ||
− | + | ** An oil and gas field located in block 22/12a, approximately 160 km east of Peterhead. | |
− | + | ** The project involved the drilling of a single production well in the Howe Field and the laying 14 km of 8" production pipeline and a 3" gas lift line from the field to the Nelson platform. | |
* Oil is transported on the [[Forties Pipeline System]] and gas via the [[Fulmar Gas Pipeline]] to the [[SEGAL St Fergus Gas Processing Terminal]] | * Oil is transported on the [[Forties Pipeline System]] and gas via the [[Fulmar Gas Pipeline]] to the [[SEGAL St Fergus Gas Processing Terminal]] | ||
Latest revision as of 16:06, 3 September 2023
Summary Information
- Operator: Shell
- Country: UK
- Location: North Sea
- Production start: 1994
- Partners:
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The development consists of a small manned steel platform
- The Bardolino Oil Field is tied back to the Nelson Platform
- **Howe Oil Field**
- An oil and gas field located in block 22/12a, approximately 160 km east of Peterhead.
- The project involved the drilling of a single production well in the Howe Field and the laying 14 km of 8" production pipeline and a 3" gas lift line from the field to the Nelson platform.
- Oil is transported on the Forties Pipeline System and gas via the Fulmar Gas Pipeline to the SEGAL St Fergus Gas Processing Terminal
+++ Contractors
- **McDermott-ETPM:** Nelson to Forties pipeline
- **KWsubsea:** Howe P2 Development - Detailed design of high pressure / high temperature pipe
+++ History
- 1991 - Nelson development approval awarded
- 1994 - Platform installed
- 2010 - First oil from Bardolino
+++ Geology
+++ Links