Difference between revisions of "Alma and Galia Oil Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with " +++ Summary Information * Operator: EnQuest * Country: UK * Location: North Sea * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volum...") |
Abarrelfull (talk | contribs) |
||
Line 17: | Line 17: | ||
+++ Contractors | +++ Contractors | ||
* **Technip:** | * **Technip:** | ||
− | + | ** Installation of two 10” production flexible flowlines, one 8” water injection flexible flowline and one further 8” production flexible flowline, | |
− | + | ** Installation of three 8” flexible risers, | |
− | + | ** Installation of two production control umbilicals/risers, | |
− | + | ** Installation of four power cables and associated dynamic risers, | |
− | + | ** Procurement, fabrication and installation of a 175 ton manifold structure, | |
− | + | ** Associated trenching operations, tie-ins, testing and commissioning. | |
* **Jumbo:** FPSO mooring, installation and hook-up contract | * **Jumbo:** FPSO mooring, installation and hook-up contract | ||
Revision as of 09:02, 24 August 2023
+++ Summary Information
- Operator: EnQuest
- Country: UK
- Location: North Sea
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The field is to be operated together with the Alma Oil Field using the Enquest Producer FPSO
- Was previously called Duncan Oil Field
+++ Contractors
- **Technip:**
- Installation of two 10” production flexible flowlines, one 8” water injection flexible flowline and one further 8” production flexible flowline,
- Installation of three 8” flexible risers,
- Installation of two production control umbilicals/risers,
- Installation of four power cables and associated dynamic risers,
- Procurement, fabrication and installation of a 175 ton manifold structure,
- Associated trenching operations, tie-ins, testing and commissioning.
- **Jumbo:** FPSO mooring, installation and hook-up contract
+++ History
- 1983 - Duncan field development approved
- 2012 - Field development approval given
- 2012 - Technip awarded subsea contract
- 2012 - Jumbo awarded FPSO mooring, installation and hook-up contract
- 2014 - FPSO mooring spread installed