Difference between revisions of "Uaru FPSO"

From A Barrel Full
Jump to navigation Jump to search
Line 12: Line 12:
 
=== Brief Description ===
 
=== Brief Description ===
  
* The FPSO will be designed to produce 250,000 barrels of oil per day, will have associated gas treatment capacity of 540 million cubic feet per day and water injection capacity of 350,000 barrels per day.
+
* The Uaru FPSO is named ‘Errea Wittu’, which means ‘abundance’
 +
The FPSO will have a topside designed to produce approximately 250,000 barrels of oil per day and will have associated gas treatment capacity of 540 million cubic feet per day, water injection capacity of 350,000 barrels per day and produced water capacity of 300,000 barrels per day.
 +
* It will be able to store around 2 million barrels of crude oil.
  
 
=== Contractors ===
 
=== Contractors ===
* Modec: Front End Engineering and Design
+
* Modec: Front End Engineering and Design & EPCI
 +
* SOFEC: Spread Mooring System
  
 
=== Status ===
 
=== Status ===
Line 22: Line 25:
 
=== History ===
 
=== History ===
 
* 2022 - Modec awarded Front End Engineering and Design
 
* 2022 - Modec awarded Front End Engineering and Design
 +
* 2023 - EPCI phase launched following FID
  
 
=== Other Information ===
 
=== Other Information ===
Line 30: Line 34:
  
 
# [https://abarrelfull.blogspot.com/2023/04/modec-awarded-feed-contract-for.html MODEC awarded FEED contract for ExxonMobil’s “Uaru” project in Guyana]
 
# [https://abarrelfull.blogspot.com/2023/04/modec-awarded-feed-contract-for.html MODEC awarded FEED contract for ExxonMobil’s “Uaru” project in Guyana]
 +
# [https://a-barrel-full.blogspot.com/2023/05/modecs-uaru-fpso-project-for-offshore.html MODEC’s Uaru FPSO Project for offshore Guyana proceeds to EPCI Phase]
  
 
[[Category:FSPO]]
 
[[Category:FSPO]]
 
[[Category:Guyana]]
 
[[Category:Guyana]]
 
[[Category:Exxon]]
 
[[Category:Exxon]]

Revision as of 13:53, 9 May 2023

Summary Information

  • Name: Uaru FPSO
  • Field: Uaru_Oil_Field
  • Country: Guyana
  • Ownership:
  • Website:
  • Field Operated By: Exxon
  • Capacity: 250,000 bpd
  • Year of Completion:

Brief Description

  • The Uaru FPSO is named ‘Errea Wittu’, which means ‘abundance’
  • The FPSO will have a topside designed to produce approximately 250,000 barrels of oil per day and will have associated gas treatment capacity of 540 million cubic feet per day, water injection capacity of 350,000 barrels per day and produced water capacity of 300,000 barrels per day.
  • It will be able to store around 2 million barrels of crude oil.

Contractors

  • Modec: Front End Engineering and Design & EPCI
  • SOFEC: Spread Mooring System

Status

  • Planned

History

  • 2022 - Modec awarded Front End Engineering and Design
  • 2023 - EPCI phase launched following FID

Other Information

  • -

Links

  1. MODEC awarded FEED contract for ExxonMobil’s “Uaru” project in Guyana
  2. MODEC’s Uaru FPSO Project for offshore Guyana proceeds to EPCI Phase