* The onshore gas processing facilities will process one billion standard cubic feet per day (SCFD) of gas | * The onshore gas processing facilities will process one billion standard cubic feet per day (SCFD) of gas | ||
* Sour gas is delivered via a 110-kilometer subsea pipeline to the [[Khursaniyah Gas Processing Plant]] | * Sour gas is delivered via a 110-kilometer subsea pipeline to the [[Khursaniyah Gas Processing Plant]] | ||
+ | * Gas from the [[Hasbah Gas Field]] is transported via Karan | ||
+++ Contractors | +++ Contractors | ||
Line 40: | Line 41: | ||
# [http://killajoules.wikidot.com/blog:2827 McDermott Awarded Two Projects for Saudi Aramco] | # [http://killajoules.wikidot.com/blog:2827 McDermott Awarded Two Projects for Saudi Aramco] | ||
# [http://killajoules.wikidot.com/archive:karan-milestone-reached Karan milestone reached] | # [http://killajoules.wikidot.com/archive:karan-milestone-reached Karan milestone reached] | ||
+ | # [https://abarrelfull.blogspot.com/2023/01/mcdermott-awarded-offshore-epci.html McDermott Awarded Offshore EPCI Contract by Saudi Aramco] |
Latest revision as of 16:45, 17 January 2023
Summary Information
- Operator: Saudi Aramco
- Country: Saudi Arabia
- Location: Offshore
- Production start: 2012
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume: 1.8 billion cubic feet per day (Bcf/d)
+++ Description
- Saudi Arabia's first offshore non-associated gas development
- The project comprises four wellhead complexes each of which has a platform topside with gas, chemical injection, and controls facilities as well as a bridge connected auxiliary platform, associated flare bridges and stacks.
- The four wellhead complexes are clustered around a tie-in platform with similar facilities. The project also includes intrafield pipelines as well as a 110 kilometer trunkline to the shore and all subsea power distribution cables
- The onshore gas processing facilities will process one billion standard cubic feet per day (SCFD) of gas
- Sour gas is delivered via a 110-kilometer subsea pipeline to the Khursaniyah Gas Processing Plant
- Gas from the Hasbah Gas Field is transported via Karan
+++ Contractors
- **Foster Wheeler:** Front-end engineering design (FEED) and program management services contract for onshore gas processing facilities
- **McDermott:**
- Offshore Platforms and Subsea Pipelines
- Fabrication of a new wellhead platform, auxiliary platform, jacket and link bridge, with subsea installation of a 20-inch flowline and a 15kV composite power and fiber optic cable
- **FoundOcean:** Grouting
+++ History
- 2006 - Karan Gas Field discovered
- 2007 - Foster Wheeler awarded onshore gas processing facilities contract
- 2008 - McDermott awarded Offshore Platforms and Subsea Pipelines
- 2012 - McDermott awarded platform contract
- 2012 - Gas processing facilities completed
+++ Geology
+++ Links
- Exploration And Production In Saudi Arabia
- FoundOcean Subsea References
- Foster Wheeler Awarded Feed for Karan Onshore Gas Processing Facilities in Saudi Arabia
- J. Ray Awarded Karan Project in Saudi Arabia
- McDermott Awarded Two Projects for Saudi Aramco
- Karan milestone reached
- McDermott Awarded Offshore EPCI Contract by Saudi Aramco