Difference between revisions of "Jebel Ali Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: Emirates National Oil Co (ENOC) * Website: http://www.enoc.com/ * Location: Jebel Ali, Dubai * Capacity: 6.0 million tons/annum & 120...") |
Abarrelfull (talk | contribs) |
||
Line 8: | Line 8: | ||
* Refining Depth: | * Refining Depth: | ||
− | + | === Brief Description === | |
* A condensate processing refinery | * A condensate processing refinery | ||
− | + | === Refining Units === | |
− | * | + | * Atmospheric Distillation *2 |
* Merox sweetening units * 5 | * Merox sweetening units * 5 | ||
* liquefied petroleum gas/naphtha hydrotreater - 70,000 bpd | * liquefied petroleum gas/naphtha hydrotreater - 70,000 bpd | ||
* Crude catalytic reformer - 35,000 bpd | * Crude catalytic reformer - 35,000 bpd | ||
− | + | === Terminal Capacity === | |
* Crude Oil: | * Crude Oil: | ||
* Refined Products: | * Refined Products: | ||
− | + | === Crude Supply === | |
* The condensate is supplied by Iran | * The condensate is supplied by Iran | ||
− | + | === Products Produced === | |
* LPG, naphtha, jet fuel, diesel and fuel oil | * LPG, naphtha, jet fuel, diesel and fuel oil | ||
− | + | === Projects === | |
* The [[Jebel Ali Refinery Expansion Project]] was launched in 2016 | * The [[Jebel Ali Refinery Expansion Project]] was launched in 2016 | ||
Line 36: | Line 36: | ||
* The refinery is to be expanded with the addition of a 70,000 bpd Condensate processing train | * The refinery is to be expanded with the addition of a 70,000 bpd Condensate processing train | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === History === | |
* 1999 - Refinery begins operations | * 1999 - Refinery begins operations | ||
* 2005 - Foster Wheeler Awarded Contract for EPC Phase of Refinery Upgrade | * 2005 - Foster Wheeler Awarded Contract for EPC Phase of Refinery Upgrade | ||
Line 46: | Line 46: | ||
* 2016 - Technip awarded expansion contract | * 2016 - Technip awarded expansion contract | ||
− | + | === Relevant Links === | |
# [http://killajoules.wikidot.com/archive:foster-wheeler-awarded-contract-for-epc-phase-of-maj Foster Wheeler Awarded Contract for EPC Phase of Major Condensate Refinery Upgrade in UAE] | # [http://killajoules.wikidot.com/archive:foster-wheeler-awarded-contract-for-epc-phase-of-maj Foster Wheeler Awarded Contract for EPC Phase of Major Condensate Refinery Upgrade in UAE] | ||
# [http://killajoules.wikidot.com/archive:l-t-bags-177-75-million-usd-contracts-for-hydrocarbo L&T bags 177.75 million USD contracts for hydrocarbon sector from the Gulf Region] | # [http://killajoules.wikidot.com/archive:l-t-bags-177-75-million-usd-contracts-for-hydrocarbo L&T bags 177.75 million USD contracts for hydrocarbon sector from the Gulf Region] |
Latest revision as of 09:28, 22 October 2020
Contents
Summary Information
- Ownership: Emirates National Oil Co (ENOC)
- Website: http://www.enoc.com/
- Location: Jebel Ali, Dubai
- Capacity: 6.0 million tons/annum & 120,000 bbl/day
- Nelson Complexity:
- Refining Depth:
Brief Description
- A condensate processing refinery
Refining Units
- Atmospheric Distillation *2
- Merox sweetening units * 5
- liquefied petroleum gas/naphtha hydrotreater - 70,000 bpd
- Crude catalytic reformer - 35,000 bpd
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- The condensate is supplied by Iran
Products Produced
- LPG, naphtha, jet fuel, diesel and fuel oil
Projects
- The Jebel Ali Refinery Expansion Project was launched in 2016
- The [[[Jebel Ali Refinery Upgrade Project]]] has recently been completed
- The upgrade will add new processing units (jet and diesel hydrotreaters and isomerization unit) and will lead to production of several Euro V grade products such as high octane gasoline, low sulfur jet fuel and ultra-low sulfur diesel.
- The refinery is to be expanded with the addition of a 70,000 bpd Condensate processing train
Other Information
- -
History
- 1999 - Refinery begins operations
- 2005 - Foster Wheeler Awarded Contract for EPC Phase of Refinery Upgrade
- 2007 - L&T awarded clean fuels contract
- 2014 - KBR awarded contract for upgrade
- 2016 - Technip awarded expansion contract
Relevant Links
- Foster Wheeler Awarded Contract for EPC Phase of Major Condensate Refinery Upgrade in UAE
- L&T bags 177.75 million USD contracts for hydrocarbon sector from the Gulf Region
- L&T Bags AED 187 Million Order
- KBR Awarded FEED Contract for the Upgrade of the Jebel Ali Refinery in the Jebel Ali Free Zone, Dubai
- ENOC announces Technip as main EPC Contractor for refinery expansion project