Difference between revisions of "Jebel Ali Refinery"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Ownership: Emirates National Oil Co (ENOC) * Website: http://www.enoc.com/ * Location: Jebel Ali, Dubai * Capacity: 6.0 million tons/annum & 120...")
 
 
Line 8: Line 8:
 
* Refining Depth:
 
* Refining Depth:
  
+++ Brief Description
+
=== Brief Description ===
 
* A condensate processing refinery
 
* A condensate processing refinery
  
+++ Refining Units
+
=== Refining Units ===
  
* [[[Atmospheric Distillation]]] *2
+
* Atmospheric Distillation *2
 
* Merox sweetening units * 5
 
* Merox sweetening units * 5
 
* liquefied petroleum gas/naphtha hydrotreater - 70,000 bpd
 
* liquefied petroleum gas/naphtha hydrotreater - 70,000 bpd
 
* Crude catalytic reformer - 35,000 bpd
 
* Crude catalytic reformer - 35,000 bpd
  
+++ Terminal Capacity
+
=== Terminal Capacity ===
  
 
* Crude Oil:  
 
* Crude Oil:  
 
* Refined Products:  
 
* Refined Products:  
  
+++ Crude Supply
+
=== Crude Supply ===
 
* The condensate is supplied by Iran
 
* The condensate is supplied by Iran
  
+++ Products Produced
+
=== Products Produced ===
 
*  LPG, naphtha, jet fuel, diesel and fuel oil
 
*  LPG, naphtha, jet fuel, diesel and fuel oil
  
+++ Ongoing Projects
+
=== Projects ===
  
 
* The [[Jebel Ali Refinery Expansion Project]] was launched in 2016
 
* The [[Jebel Ali Refinery Expansion Project]] was launched in 2016
Line 36: Line 36:
 
* The refinery is to be expanded with the addition of a 70,000 bpd Condensate processing train
 
* The refinery is to be expanded with the addition of a 70,000 bpd Condensate processing train
  
+++ Other Information
+
=== Other Information ===
 
* -
 
* -
  
+++ History
+
=== History ===
 
* 1999 - Refinery begins operations
 
* 1999 - Refinery begins operations
 
* 2005 - Foster Wheeler Awarded Contract for EPC Phase of Refinery Upgrade
 
* 2005 - Foster Wheeler Awarded Contract for EPC Phase of Refinery Upgrade
Line 46: Line 46:
 
* 2016 - Technip awarded expansion contract
 
* 2016 - Technip awarded expansion contract
  
+++ Relevant Links
+
=== Relevant Links ===
 
# [http://killajoules.wikidot.com/archive:foster-wheeler-awarded-contract-for-epc-phase-of-maj Foster Wheeler Awarded Contract for EPC Phase of Major Condensate Refinery Upgrade in UAE]
 
# [http://killajoules.wikidot.com/archive:foster-wheeler-awarded-contract-for-epc-phase-of-maj Foster Wheeler Awarded Contract for EPC Phase of Major Condensate Refinery Upgrade in UAE]
 
# [http://killajoules.wikidot.com/archive:l-t-bags-177-75-million-usd-contracts-for-hydrocarbo L&T bags 177.75 million USD contracts for hydrocarbon sector from the Gulf Region]
 
# [http://killajoules.wikidot.com/archive:l-t-bags-177-75-million-usd-contracts-for-hydrocarbo L&T bags 177.75 million USD contracts for hydrocarbon sector from the Gulf Region]

Latest revision as of 09:28, 22 October 2020

Summary Information

  • Ownership: Emirates National Oil Co (ENOC)
  • Website: http://www.enoc.com/
  • Location: Jebel Ali, Dubai
  • Capacity: 6.0 million tons/annum & 120,000 bbl/day
  • Nelson Complexity:
  • Refining Depth:

Brief Description

  • A condensate processing refinery

Refining Units

  • Atmospheric Distillation *2
  • Merox sweetening units * 5
  • liquefied petroleum gas/naphtha hydrotreater - 70,000 bpd
  • Crude catalytic reformer - 35,000 bpd

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • The condensate is supplied by Iran

Products Produced

  • LPG, naphtha, jet fuel, diesel and fuel oil

Projects

  • The Jebel Ali Refinery Expansion Project was launched in 2016
  • The [[[Jebel Ali Refinery Upgrade Project]]] has recently been completed
  • The upgrade will add new processing units (jet and diesel hydrotreaters and isomerization unit) and will lead to production of several Euro V grade products such as high octane gasoline, low sulfur jet fuel and ultra-low sulfur diesel.
  • The refinery is to be expanded with the addition of a 70,000 bpd Condensate processing train

Other Information

  • -

History

  • 1999 - Refinery begins operations
  • 2005 - Foster Wheeler Awarded Contract for EPC Phase of Refinery Upgrade
  • 2007 - L&T awarded clean fuels contract
  • 2014 - KBR awarded contract for upgrade
  • 2016 - Technip awarded expansion contract

Relevant Links

  1. Foster Wheeler Awarded Contract for EPC Phase of Major Condensate Refinery Upgrade in UAE
  2. L&T bags 177.75 million USD contracts for hydrocarbon sector from the Gulf Region
  3. L&T Bags AED 187 Million Order
  4. KBR Awarded FEED Contract for the Upgrade of the Jebel Ali Refinery in the Jebel Ali Free Zone, Dubai
  5. ENOC announces Technip as main EPC Contractor for refinery expansion project