Difference between revisions of "Dos Bocas Refinery Project"

From A Barrel Full
Jump to navigation Jump to search
Line 13: Line 13:
 
* Project Summary:
 
* Project Summary:
 
* Main Contractors
 
* Main Contractors
 +
** Samsung Engineering: Package 2 which includes Diesel Hydrodesulfurization(DHDT) Unit, Gasoil Hydrodesulfurization(HDS) Unit, Naphtha Hydro-treating(NHT) Unit and Naphtha Reformer and Package 3 which includes Fluid Catalytic Cracking (FCC) Unit.
 
* Licences:
 
* Licences:
=== Refining Units
+
=== Refining Units ===
* -
+
* Diesel Hydrodesulphurisation
 +
* Gasoil Hydrodesulphurisation
 +
* Naphtha Hydro-treating
 +
* Naphtha Reformer
 +
* Fluid Catalytic Cracking (FCC) Unit
 +
 
 
=== Terminal Capacity ===
 
=== Terminal Capacity ===
 
* Crude Oil:
 
* Crude Oil:

Revision as of 17:18, 1 February 2020

Summary Information

  • Ownership: Pemex
  • Website:
  • Wiki Page:
  • Location:
  • Capacity: million tons/annum & bbl/day
  • Nelson Complexity:
  • Project Stage:
  • Expected Completion: 2020
  • Budget: $10 Billion

The Project

  • Project Type: Greenfield Refinery
  • Project Summary:
  • Main Contractors
    • Samsung Engineering: Package 2 which includes Diesel Hydrodesulfurization(DHDT) Unit, Gasoil Hydrodesulfurization(HDS) Unit, Naphtha Hydro-treating(NHT) Unit and Naphtha Reformer and Package 3 which includes Fluid Catalytic Cracking (FCC) Unit.
  • Licences:

Refining Units

  • Diesel Hydrodesulphurisation
  • Gasoil Hydrodesulphurisation
  • Naphtha Hydro-treating
  • Naphtha Reformer
  • Fluid Catalytic Cracking (FCC) Unit

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • -

Products Produced

  • -

History

  • 2019 - Samsung Engineering awarded EPC contract

Other Information

  • -

Links