Difference between revisions of "Commonwealth LNG Export Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 13: | Line 13: | ||
* Storage capacity: | * Storage capacity: | ||
* Constructor: | * Constructor: | ||
− | ** Arup: specialist engineering services for the modular LNG storage tanks | + | ** '''Arup:''' specialist engineering services for the modular LNG storage tanks |
+ | ** '''Baker Hughes:''' Gas turbines | ||
* Licensor: | * Licensor: | ||
Line 26: | Line 27: | ||
* 2019 - Application made for export licence | * 2019 - Application made for export licence | ||
* 2021 - Tender launched for sale of LNG | * 2021 - Tender launched for sale of LNG | ||
+ | * 2023 - Contract awarded to Baker Hughes for turbines | ||
=== Other Information === | === Other Information === | ||
Line 36: | Line 38: | ||
# [https://abarrelfull.blogspot.com/2022/11/arup-appointed-to-advise-on-industry.html Arup appointed to advise on industry first LNG modular tank design] | # [https://abarrelfull.blogspot.com/2022/11/arup-appointed-to-advise-on-industry.html Arup appointed to advise on industry first LNG modular tank design] | ||
# [https://abarrelfull.blogspot.com/2022/11/commonwealth-lng-launches-tender-for.html Commonwealth LNG Launches Tender for LNG Offtake] | # [https://abarrelfull.blogspot.com/2022/11/commonwealth-lng-launches-tender-for.html Commonwealth LNG Launches Tender for LNG Offtake] | ||
+ | # [https://abarrelfull.blogspot.com/2024/02/commonwealth-lng-and-baker-hughes-sign.html Commonwealth LNG and Baker Hughes Sign Strategic Agreement] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:USA]] | [[category:USA]] | ||
[[category:company]] | [[category:company]] |
Revision as of 16:10, 9 February 2024
Contents
Summary Information
- Ownership: Commonwealth LNG
- Website: https://commonwealthlng.com/
- Location: Calcasieu Ship Channel, Cameron, Louisiana
- Capacity: 9.3 million tons/annum
- Status: / Planned
Brief Description
- Commonwealth LNG is an 8.4 mtpa LNG liquefaction and export facility located on the west bank of the Calcasieu Ship Channel at the mouth of the Gulf of Mexico near Cameron, Louisiana. The facility will have six 50,000 M3 modular storage tanks and will be able to accommodate vessels up to 216,000 M3. Gas supply is achieved with the addition of a 3.0-mile pipeline interconnected to two major pipeline systems with significant excess transportation capacity.
Technical Details
- Storage capacity:
- Constructor:
- Arup: specialist engineering services for the modular LNG storage tanks
- Baker Hughes: Gas turbines
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 2026
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2019 - Application made for export licence
- 2021 - Tender launched for sale of LNG
- 2023 - Contract awarded to Baker Hughes for turbines
Other Information
- -