Difference between revisions of "AURA Oil And Gas Processing References"

From A Barrel Full
Jump to navigation Jump to search
Line 7: Line 7:
 
#* CPE - IRAQ
 
#* CPE - IRAQ
 
#* 3x8000kW - Fired boiler - Phase I
 
#* 3x8000kW - Fired boiler - Phase I
 
+
# [[Madura BD Offshore Gas and Condensate Field]]
 
+
#* Indonesia
 
+
#* CNOOC Indonesia
 
+
#* 4x12000kW (3x41 MBtu/h) (Gas fired)
4x12000kW (3x41 MBtu/h) (Gas fired)
+
#* 4x10000kW (4x34 MBtu/h) (Diesel, Crude Oil and Gas Fired)
CNOOC Indonesia Sumatra Gas Field 4x10000kW (4x34 MBtu/h) (Diesel, Crude Oil and Gas Fired)
+
#* QHD326 FPSO
CNOOC QHD326 FPSO
 
  
 
12000kW (41 MBtu/h) (Heavy Oil fired)
 
12000kW (41 MBtu/h) (Heavy Oil fired)

Revision as of 14:16, 11 December 2023

  1. Liwan 3-1 Gas Field
    • China
    • CNOOC
    • 4x12000kW - WHRU
  2. Halfaya Oil Field
    • IRAQ
    • CPE - IRAQ
    • 3x8000kW - Fired boiler - Phase I
  3. Madura BD Offshore Gas and Condensate Field
    • Indonesia
    • CNOOC Indonesia
    • 4x12000kW (3x41 MBtu/h) (Gas fired)
    • 4x10000kW (4x34 MBtu/h) (Diesel, Crude Oil and Gas Fired)
    • QHD326 FPSO

12000kW (41 MBtu/h) (Heavy Oil fired) Shanghai Petro-chemical, Polyester Production


  1. Beijing Yanshan Company Refinery
    • China
    • SINOPEC Yanshan Petro-chemical
    • 2x3000kW (2x10 MBtu/h) (Diesel Oil, Gas fired)

2x6100kW (2x21 MBtu/h) (Gas fired) CNPC (International) Sudan Fula Oil Field

  1. Luda 27-2 And LD 32-2 Oil Fields
    • China
    • CNOOC
    • 3x5000kW (3x17 MBtu/h) (WHRU)




2x4x13200kW (2x4x45 MBtu/h) (Diesel oil & Crude oil fired) PDOC Sudan Block3-7


  1. Kela-2 Gas Field
    • China
    • CNPC
    • 2x6700kW (2x23 MBtu/h) (Gas fired)
  2. Qinhuangdao Offshore Oil Field
    • Nanbao Offshore Oil Field
    • China
    • CNOOC
    • 3x5000kW (3x17 MBtu/h) (Gas,diesel oil & crude oil fired)
  3. Bozhong 28-2S Oil Fields
    • China
    • CNOOC
    • 3x6000kW (3x20 MBtu/h) (WHRU)