Difference between revisions of "AURA Oil And Gas Processing References"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 7: | Line 7: | ||
#* CPE - IRAQ | #* CPE - IRAQ | ||
#* 3x8000kW - Fired boiler - Phase I | #* 3x8000kW - Fired boiler - Phase I | ||
− | + | # [[Madura BD Offshore Gas and Condensate Field]] | |
− | + | #* Indonesia | |
− | + | #* CNOOC Indonesia | |
− | + | #* 4x12000kW (3x41 MBtu/h) (Gas fired) | |
− | 4x12000kW (3x41 MBtu/h) (Gas fired) | + | #* 4x10000kW (4x34 MBtu/h) (Diesel, Crude Oil and Gas Fired) |
− | + | #* QHD326 FPSO | |
− | |||
12000kW (41 MBtu/h) (Heavy Oil fired) | 12000kW (41 MBtu/h) (Heavy Oil fired) |
Revision as of 14:16, 11 December 2023
- Liwan 3-1 Gas Field
- China
- CNOOC
- 4x12000kW - WHRU
- Halfaya Oil Field
- IRAQ
- CPE - IRAQ
- 3x8000kW - Fired boiler - Phase I
- Madura BD Offshore Gas and Condensate Field
- Indonesia
- CNOOC Indonesia
- 4x12000kW (3x41 MBtu/h) (Gas fired)
- 4x10000kW (4x34 MBtu/h) (Diesel, Crude Oil and Gas Fired)
- QHD326 FPSO
12000kW (41 MBtu/h) (Heavy Oil fired) Shanghai Petro-chemical, Polyester Production
- Beijing Yanshan Company Refinery
- China
- SINOPEC Yanshan Petro-chemical
- 2x3000kW (2x10 MBtu/h) (Diesel Oil, Gas fired)
2x6100kW (2x21 MBtu/h) (Gas fired) CNPC (International) Sudan Fula Oil Field
- Luda 27-2 And LD 32-2 Oil Fields
- China
- CNOOC
- 3x5000kW (3x17 MBtu/h) (WHRU)
2x4x13200kW (2x4x45 MBtu/h) (Diesel oil & Crude oil fired)
PDOC Sudan Block3-7
- Kela-2 Gas Field
- China
- CNPC
- 2x6700kW (2x23 MBtu/h) (Gas fired)
- Qinhuangdao Offshore Oil Field
- Nanbao Offshore Oil Field
- China
- CNOOC
- 3x5000kW (3x17 MBtu/h) (Gas,diesel oil & crude oil fired)
- Bozhong 28-2S Oil Fields
- China
- CNOOC
- 3x6000kW (3x20 MBtu/h) (WHRU)