Difference between revisions of "Geographe and Thylacine Gas Fields"

From A Barrel Full
Jump to navigation Jump to search
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
 
* Operator: Origin
 
* Operator: Origin
 
* Country: Australia  
 
* Country: Australia  
Line 5: Line 5:
 
* Production start: 2007
 
* Production start: 2007
 
* Partners:  
 
* Partners:  
* Type:Gas
+
* Type: Gas
 
* Estimated Reserves:  
 
* Estimated Reserves:  
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
 
* '''Otway Gas Project''' consists of two offshore gas fields, Geographe and Thylacine, and an onshore gas processing facility, [[Otway Gas Processing Plant]], near Port Campbell in south-west Victoria.
 
* '''Otway Gas Project''' consists of two offshore gas fields, Geographe and Thylacine, and an onshore gas processing facility, [[Otway Gas Processing Plant]], near Port Campbell in south-west Victoria.
 
* There is a wellhead platform on the Thylacine reservoir, a subsea manifold on the Geographe reservoir and a subsea pipeline from the wellhead platform to the onshore gas plant  
 
* There is a wellhead platform on the Thylacine reservoir, a subsea manifold on the Geographe reservoir and a subsea pipeline from the wellhead platform to the onshore gas plant  
 
* The Thylacine field was developed in the first phase and Geographe in the second
 
* The Thylacine field was developed in the first phase and Geographe in the second
  
+++ Contractors
+
=== Contractors ===
 
* **Technip:** Project management, detailed engineering, procurement of equipment and material, construction and pre-commissioning of the wellhead platform, the onshore gas plant and onshore pipeline.
 
* **Technip:** Project management, detailed engineering, procurement of equipment and material, construction and pre-commissioning of the wellhead platform, the onshore gas plant and onshore pipeline.
  
+++ History
+
=== History ===
 
* 2001 - Geographe  
 
* 2001 - Geographe  
 
* 2004 - FID taken for the project
 
* 2004 - FID taken for the project
Line 24: Line 24:
 
* 2012 - Drilling started on Geographe
 
* 2012 - Drilling started on Geographe
 
* 2013 - Geographe field came onstream
 
* 2013 - Geographe field came onstream
 +
* 2022 - First gas from Geographe 5 & 6
  
+++ Geology
+
=== Geology ===
 
* The reservoir consists of Waarre Sandstone
 
* The reservoir consists of Waarre Sandstone
  
+++ Links
+
=== Links ===
 
# [[Offshore Oil And Gas Production Platforms In Australia]]
 
# [[Offshore Oil And Gas Production Platforms In Australia]]
 
# [[Technip Oil And Gas Processing References]]
 
# [[Technip Oil And Gas Processing References]]
Line 39: Line 40:
 
# [http://killajoules.wikidot.com/blog:2575 Commencement of operations at Geographe gas field]
 
# [http://killajoules.wikidot.com/blog:2575 Commencement of operations at Geographe gas field]
 
# [http://killajoules.wikidot.com/blog:4403 Production commences from Otway Gas Project's Geographe field]
 
# [http://killajoules.wikidot.com/blog:4403 Production commences from Otway Gas Project's Geographe field]
 +
# [https://abarrelfull.blogspot.com/2023/11/first-gas-from-geographe-wells.html First gas from Geographe wells]

Revision as of 08:57, 27 November 2023

Summary Information

  • Operator: Origin
  • Country: Australia
  • Location: Bass Strait
  • Production start: 2007
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • Otway Gas Project consists of two offshore gas fields, Geographe and Thylacine, and an onshore gas processing facility, Otway Gas Processing Plant, near Port Campbell in south-west Victoria.
  • There is a wellhead platform on the Thylacine reservoir, a subsea manifold on the Geographe reservoir and a subsea pipeline from the wellhead platform to the onshore gas plant
  • The Thylacine field was developed in the first phase and Geographe in the second

Contractors

  • **Technip:** Project management, detailed engineering, procurement of equipment and material, construction and pre-commissioning of the wellhead platform, the onshore gas plant and onshore pipeline.

History

  • 2001 - Geographe
  • 2004 - FID taken for the project
  • 2007 - First gas produced
  • 2009 - Origin acquired Woodside's stake
  • 2012 - Drilling started on Geographe
  • 2013 - Geographe field came onstream
  • 2022 - First gas from Geographe 5 & 6

Geology

  • The reservoir consists of Waarre Sandstone

Links

  1. Offshore Oil And Gas Production Platforms In Australia
  2. Technip Oil And Gas Processing References
  3. Thylacine – potential new gas supply to eastern Australia
  4. Geographe Gas Discovery, Offshore Otway Basin, Victoria
  5. Otway Gas Project Receives Joint Venture Approval
  6. Technip awarded two major contracts by woodside for the Otway gas project in offshore Victoria, Australia
  7. Otway Exports First Gas
  8. Origin To Increase Its Stake In The Otway Gas Project
  9. Commencement of operations at Geographe gas field
  10. Production commences from Otway Gas Project's Geographe field
  11. First gas from Geographe wells