Difference between revisions of "Cendor II FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 25: | Line 25: | ||
+++ History | +++ History | ||
* 2011 - MHB Awarded FPSO conversion contract | * 2011 - MHB Awarded FPSO conversion contract | ||
+ | * 2014 - First oil from Cendor II FPSO | ||
+++ Other Information | +++ Other Information | ||
Line 36: | Line 37: | ||
# [[BC Petrochemical Oil And Gas Processing References]] | # [[BC Petrochemical Oil And Gas Processing References]] | ||
# [http://killajoules.wikidot.com/archive:mhb-awarded-fpso-cendor-and-fsu-lekas-contracts MHB Awarded FPSO Cendor And FSU Lekas Contracts] | # [http://killajoules.wikidot.com/archive:mhb-awarded-fpso-cendor-and-fsu-lekas-contracts MHB Awarded FPSO Cendor And FSU Lekas Contracts] | ||
+ | # [https://abarrelfull.blogspot.com/2023/10/first-oil-from-cendor-phase-2.html First oil from Cendor Phase 2] |
Revision as of 07:20, 26 October 2023
Summary Information
- Name: Cendor II FPSO
- Field: Cendor Oil Field
- Country: Malaysia
- Ownership: Petrofac, PETRONAS, Kuwait Foreign Petroleum Exploration Company and PetroVietnam
- Website:
- Field Operated By: PETRONAS
- Capacity: bpd
- Year of Completion:
+++ Brief Description
- The vessel is a conversion of MT Onozo, an Aframax tanker
+++ Contractors
- **Malaysia Marine and Heavy Engineering:** Repair, life extension and conversion
- **DPS Global:** Gas Compression, Flare Knock Out, Production Separation / PWT, FEED
- **London Marine:** Mooring Structural Design
- **BC Petrochemical:** Chemical Injection Packages
+++ Status
- In operation
+++ History
- 2011 - MHB Awarded FPSO conversion contract
- 2014 - First oil from Cendor II FPSO
+++ Other Information
- -
+++ Links