Difference between revisions of "Rhyl Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Centrica * Country: UK * Location: Morecambe Bay * Production start: 2013 * Partners: * Type: Gas * Estimated Reserves: * Production Volume...") |
Abarrelfull (talk | contribs) |
||
Line 10: | Line 10: | ||
+++ Description | +++ Description | ||
− | * The Rhyl field, located 39km off the coast of Barrow. Gas from Rhyl will be produced through Centrica Energy’s existing [[ | + | * The Rhyl field, located 39km off the coast of Barrow. Gas from Rhyl will be produced through Centrica Energy’s existing [[Morecambe Hub Gas Fields | North Morecambe platform]], then come onshore to its [[Barrow Gas Processing Plant]] by pipeline |
+++ Contractors | +++ Contractors |
Latest revision as of 08:07, 31 January 2024
Summary Information
- Operator: Centrica
- Country: UK
- Location: Morecambe Bay
- Production start: 2013
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The Rhyl field, located 39km off the coast of Barrow. Gas from Rhyl will be produced through Centrica Energy’s existing North Morecambe platform, then come onshore to its Barrow Gas Processing Plant by pipeline
+++ Contractors
- -
+++ History
- 2009 - The Rhyl field was first discovered
- 2012 - Project development approved by DECC
- 2013 - Gas production started
+++ Geology
+++ Links