* The Scarborough gas resource is part of the Greater Scarborough gas fields which are estimated to hold 13.0 Tcf (2C, 100%) of dry gas.  
 
* The Scarborough gas resource is part of the Greater Scarborough gas fields which are estimated to hold 13.0 Tcf (2C, 100%) of dry gas.  
 
* The Greater Scarborough gas fields include Thebe (1.4 Tcf, 2C, 100%), Jupiter (0.5 Tcf, 2C, 100%) and Scarborough (11.1 Tcf, 2C, 100%).
 
* The Greater Scarborough gas fields include Thebe (1.4 Tcf, 2C, 100%), Jupiter (0.5 Tcf, 2C, 100%) and Scarborough (11.1 Tcf, 2C, 100%).
 +
* The proposal is to initially develop the field with eight subsea, high-rate gas wells, and thirteen wells drilled over the life of the Scarborough field, with all wells tied back to a semi-submersible floating production unit (FPU) moored in 950 m of water close to the Scarborough field.
 +
* Approximately five million tonnes per annum (Mtpa) of Scarborough gas will be processed through [[Pluto LNG Phase II Project | Pluto Train 2]], with up to 3 Mtpa processed through the existing Pluto Train 1.
  
 
=== Contractors ===
 
=== Contractors ===

Revision as of 09:14, 15 December 2021

Summary Information

  • Operator: Woodside
  • Country: Australia
  • Location: Carnarvon Basin
  • Production start:
  • Partners:
  • Type: Gas
  • Estimated Reserves: 13 TCF
  • Production Volume:

Description

  • The Scarborough gas resource is located in the Carnarvon Basin, approximately 375 km west-north-west of the Burrup Peninsula in Western Australia.
  • The Scarborough gas resource is part of the Greater Scarborough gas fields which are estimated to hold 13.0 Tcf (2C, 100%) of dry gas.
  • The Greater Scarborough gas fields include Thebe (1.4 Tcf, 2C, 100%), Jupiter (0.5 Tcf, 2C, 100%) and Scarborough (11.1 Tcf, 2C, 100%).
  • The proposal is to initially develop the field with eight subsea, high-rate gas wells, and thirteen wells drilled over the life of the Scarborough field, with all wells tied back to a semi-submersible floating production unit (FPU) moored in 950 m of water close to the Scarborough field.
  • Approximately five million tonnes per annum (Mtpa) of Scarborough gas will be processed through Pluto Train 2, with up to 3 Mtpa processed through the existing Pluto Train 1.