− | Summary Information | + | === Summary Information === |
* Ownership: Total | * Ownership: Total | ||
Line 6: | Line 6: | ||
* Capacity: | * Capacity: | ||
− | + | === Brief Description === | |
* It is a 3-train process plant that is now known as the Frigg UK Terminal. | * It is a 3-train process plant that is now known as the Frigg UK Terminal. | ||
* Gas is transported to the plant by the **[[Frigg UK Gas Pipeline System]]** and from the [[Vesterled Gas Pipeline]] which brings gas from the Norwegian sector | * Gas is transported to the plant by the **[[Frigg UK Gas Pipeline System]]** and from the [[Vesterled Gas Pipeline]] which brings gas from the Norwegian sector | ||
Line 12: | Line 12: | ||
* The SIRGE pipeline runs from the Shetland Gas Plant (SGP) at Sullom Voe on Shetland to a sub-sea tie-in on the FUKA Pipeline at the MCP01 bypass valves. | * The SIRGE pipeline runs from the Shetland Gas Plant (SGP) at Sullom Voe on Shetland to a sub-sea tie-in on the FUKA Pipeline at the MCP01 bypass valves. | ||
− | + | ==== Related Oil and Gas Fields ==== | |
− | * It processes gas from the [[Greater Alwyn Oil and Gas Fields | Alwyn Area]] (Alwyn North, Forvie, Grant, Jura, Nuggets, Islay, Dunbar and Ellon), [[Bruce Oil and Gas Field | Bruce]], [[Rhum Gas Field | Rhum]], Keith, [[Buzzard Oil Field | Buzzard]], the Flotta Catchment Area, [[Ross and Blake Oil Fields | Ross]] and [[Captain Oil Field | Captain]]. | + | * It processes gas from the [[Greater Alwyn Oil and Gas Fields | Alwyn Area]] (Alwyn North, Forvie, Grant, Jura, Nuggets, Islay, Dunbar and Ellon), [[Bruce Oil and Gas Field | Bruce]], [[Rhum Gas Field | Rhum]], Keith, [[Buzzard Oil Field | Buzzard]], the Flotta Catchment Area (including [[Piper Oil Field]]), [[Ross and Blake Oil Fields | Ross]] and [[Captain Oil Field | Captain]]. |
− | + | === Ongoing Projects === | |
* - | * - | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === History === | |
* 1977 - Phase I of the plant was commissioned | * 1977 - Phase I of the plant was commissioned | ||
* 1978 - Phase II was completed | * 1978 - Phase II was completed | ||
+ | * 2015 - NSMP acquired the terminal from Total | ||
− | + | === Links === | |
# [http://www.total-icop.co.uk/fuka/ Total, FUKA] | # [http://www.total-icop.co.uk/fuka/ Total, FUKA] | ||
+ | # [https://abarrelfull.blogspot.com/2024/05/nsmp-acquires-major-pipeline-and.html NSMP Acquires Major Pipeline and Terminal System from Total E&P UK Limited] |
Latest revision as of 15:55, 30 May 2024
Contents
Summary Information
- Ownership: Total
- Website: http://www.total.com/en
- Location: St Fergus, Scotland
- Capacity:
Brief Description
- It is a 3-train process plant that is now known as the Frigg UK Terminal.
- Gas is transported to the plant by the **Frigg UK Gas Pipeline System** and from the Vesterled Gas Pipeline which brings gas from the Norwegian sector
- The Shetland Island Regional Gas Export Pipeline System (SIRGE) will permit the tie-in of West of Shetland gas into FUKA.
- The SIRGE pipeline runs from the Shetland Gas Plant (SGP) at Sullom Voe on Shetland to a sub-sea tie-in on the FUKA Pipeline at the MCP01 bypass valves.
Related Oil and Gas Fields
- It processes gas from the Alwyn Area (Alwyn North, Forvie, Grant, Jura, Nuggets, Islay, Dunbar and Ellon), Bruce, Rhum, Keith, Buzzard, the Flotta Catchment Area (including Piper Oil Field), Ross and Captain.
Ongoing Projects
- -
Other Information
- -
History
- 1977 - Phase I of the plant was commissioned
- 1978 - Phase II was completed
- 2015 - NSMP acquired the terminal from Total