Difference between revisions of "Baldpate Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 11: | Line 11: | ||
=== Description === | === Description === | ||
* The development utilises a Compliant Tower located in 1,605 feet of water | * The development utilises a Compliant Tower located in 1,605 feet of water | ||
+ | * Penn State is a subsea tieback to Baldpate | ||
* Gas is transported on the [[Garden Banks Gas Pipeline]] | * Gas is transported on the [[Garden Banks Gas Pipeline]] | ||
* Oil is delivered to the SM 205 platform of the [[Poseidon Oil Pipeline]] | * Oil is delivered to the SM 205 platform of the [[Poseidon Oil Pipeline]] | ||
Line 22: | Line 23: | ||
=== History === | === History === | ||
* 1991 - Baldpate Oil And Gas Field discovered | * 1991 - Baldpate Oil And Gas Field discovered | ||
+ | * 1995 - Penn State discovered | ||
* 1998 - First oil produced | * 1998 - First oil produced | ||
+ | * 1999 - First oil from Penn State | ||
* 2023 - Chevron agreed to acquire Hess, becoming a partner | * 2023 - Chevron agreed to acquire Hess, becoming a partner | ||
Latest revision as of 15:52, 23 October 2023
Summary Information
- Operator: Hess
- Country: USA
- Location: Garden Banks Blocks 215, 216, 259 & 260, Gulf of Mexico
- Production start: 1998
- Partners: Anadarko
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The development utilises a Compliant Tower located in 1,605 feet of water
- Penn State is a subsea tieback to Baldpate
- Gas is transported on the Garden Banks Gas Pipeline
- Oil is delivered to the SM 205 platform of the Poseidon Oil Pipeline
Contractors
- **Gulf Marine Fab:** Construction of Compliant Tower
- **UniversalPegasus:** Engineering services including conceptual and detailed design for the installation of a single flowline, control system, installation of high-pressure boarding valve skid, and new structural support system to receive riser
- **Cal Dive International:** Installation of a 16-inch oil riser and 12-inch gas riser
- **Heerema Marine Contractors:** Baldpate Compliant Tower Installation
History
- 1991 - Baldpate Oil And Gas Field discovered
- 1995 - Penn State discovered
- 1998 - First oil produced
- 1999 - First oil from Penn State
- 2023 - Chevron agreed to acquire Hess, becoming a partner