Difference between revisions of "Habshan Gas Processing Plant"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: * Website: * Location: * Capacity: === Brief Description === * - === Related Oil and Gas Fields === * === Ongoing Projects ==...") |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: ADNOC Gas |
− | * Website: | + | * Website: https://adnocgas.ae/ |
− | * Location: | + | * Location: Abu Dhabi |
* Capacity: | * Capacity: | ||
=== Brief Description === | === Brief Description === | ||
− | * | + | * The Habshan Gas Complex, is one of the world's largest gas processing plants |
+ | * It consists of 5 processing trains | ||
=== Related Oil and Gas Fields === | === Related Oil and Gas Fields === | ||
− | * | + | * It treats associated gas from the [[Habshan Oil and Gas Field]] and [[Bab Oil and Gas Field]] |
=== Ongoing Projects === | === Ongoing Projects === | ||
− | * - | + | * The Maximizing Ethane Recovery and Monetization (MERAM) project began in 2023 |
+ | * It will increase ethane extraction by a range of 35 - 40% | ||
+ | * A new 120 kilometre natural gas liquids (NGL) pipeline will be built to Ruwais | ||
+ | NGLs pipeline | ||
+ | * The project is being built by Técnicas Reunidas and NPCC | ||
=== Other Information === | === Other Information === | ||
Line 19: | Line 24: | ||
=== History === | === History === | ||
− | * - | + | * 1984 - The facility was commissioned |
+ | * 2005 - Fluor awarded EPC contract for expansion project | ||
+ | * 2006 - Foster Wheeler awarded management contract | ||
+ | * 2013 - JGC completed expansion project | ||
+ | * 2023 - ADNOC Gas awards contracts for MERAM project | ||
− | === | + | === Links === |
− | # [ ] | + | # [http://www.gasco.ae/web/business/Habshan.aspx?mnu=bus&lft=2&lftSub=2 Habshan-Bab, GASCO] |
+ | # [[JGC Oil And Gas Processing References]] | ||
+ | # [http://killajoules.wikidot.com/archive:fluor-wins-habshan-gas-processing-work-in-abu-dhabi Fluor Wins Habshan Gas Processing Work in Abu Dhabi] | ||
+ | # [http://killajoules.wikidot.com/archive:foster-wheeler-selected-to-manage-epc-phase-of-gasco Foster Wheeler Selected to Manage EPC Phase of GASCO's Habshan Gas Complex Expansion in the UAE] | ||
+ | # [https://a-barrel-full.blogspot.com/2023/09/adnoc-gas-awards-36-billion-contract-to.html ADNOC Gas Awards $3.6 Billion Contract to Expand its Gas Processing Infrastructure] |
Latest revision as of 09:16, 10 September 2023
Contents
Summary Information
- Ownership: ADNOC Gas
- Website: https://adnocgas.ae/
- Location: Abu Dhabi
- Capacity:
Brief Description
- The Habshan Gas Complex, is one of the world's largest gas processing plants
- It consists of 5 processing trains
Related Oil and Gas Fields
- It treats associated gas from the Habshan Oil and Gas Field and Bab Oil and Gas Field
Ongoing Projects
- The Maximizing Ethane Recovery and Monetization (MERAM) project began in 2023
- It will increase ethane extraction by a range of 35 - 40%
- A new 120 kilometre natural gas liquids (NGL) pipeline will be built to Ruwais
NGLs pipeline
- The project is being built by Técnicas Reunidas and NPCC
Other Information
- -
History
- 1984 - The facility was commissioned
- 2005 - Fluor awarded EPC contract for expansion project
- 2006 - Foster Wheeler awarded management contract
- 2013 - JGC completed expansion project
- 2023 - ADNOC Gas awards contracts for MERAM project