Difference between revisions of "LNG Terminal Projects Completed in 2018"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 11: | Line 11: | ||
=== Import Terminals === | === Import Terminals === | ||
+ | # [[Dortyol LNG Terminal]] | ||
# The expansion of [[Revithoussa LNG Terminal]] was completed | # The expansion of [[Revithoussa LNG Terminal]] was completed |
Latest revision as of 08:30, 27 June 2022
Introduction
- Global Liquefaction capacity increased by 55.0 million tons in 2018
- Global Regasification capacity increased by 16.3 million tons in 2018
Export Terminals
- Cameroon Hilli FLNG Terminal
- Corpus Christi LNG Terminal
- Ichthys LNG Terminal
- Wheatstone LNG Terminal, second train
Import Terminals
- Dortyol LNG Terminal
- The expansion of Revithoussa LNG Terminal was completed