* Line 3 is a 1,031 mile (1,660 kilometres), 34-inch diameter pipeline that has been in operation since 1968. | * Line 3 is a 1,031 mile (1,660 kilometres), 34-inch diameter pipeline that has been in operation since 1968. | ||
+ | * The pipeline goes from Edmonton, Alberta, Canada, to Superior, Wisconsin, with 365 miles of pipeline is in the United States. | ||
* It is one of six crude oil pipelines that make up the Enbridge mainline system. | * It is one of six crude oil pipelines that make up the Enbridge mainline system. | ||
=== Pipeline Status === | === Pipeline Status === | ||
− | * The | + | |
+ | * The $2.9-billion U.S. portion of the Line 3 Replacement Program, known as the Line 3 Replacement Project, consists of replacing existing 34-inch pipe with new 36-inch pipe for 13 miles in North Dakota, 337 miles in Minnesota, and 14 miles in Wisconsin. The Wisconsin portion was completed in 2018. | ||
=== History === | === History === | ||
* 2014 - Enbridge announces $7 Billion replacement project | * 2014 - Enbridge announces $7 Billion replacement project | ||
+ | * 2020 - Permits given for Minnesota leg of replacement project | ||
+ | * 2021 - Replacement project completed | ||
=== Other Information === | === Other Information === | ||
Line 26: | Line 30: | ||
=== Links === | === Links === | ||
+ | # [[EIA Liquids Pipeline Projects 2021-2025]] | ||
# [http://killajoules.wikidot.com/blog:4993 Enbridge to Undertake $7 Billion Mainline Replacement Program] | # [http://killajoules.wikidot.com/blog:4993 Enbridge to Undertake $7 Billion Mainline Replacement Program] | ||
# [http://killajoules.wikidot.com/blog:5263 Enbridge Finalizes $7.5 Billion Mainline Replacement Program Cost Estimate; Issues CDN$400 Million of Common Equity] | # [http://killajoules.wikidot.com/blog:5263 Enbridge Finalizes $7.5 Billion Mainline Replacement Program Cost Estimate; Issues CDN$400 Million of Common Equity] | ||
# [https://a-barrel-full.blogspot.com/2020/11/enbridge-line-3-replacement-project.html Enbridge Line 3 Replacement Project Receives MPCA Approvals and Remaining DNR Permits] | # [https://a-barrel-full.blogspot.com/2020/11/enbridge-line-3-replacement-project.html Enbridge Line 3 Replacement Project Receives MPCA Approvals and Remaining DNR Permits] | ||
+ | # [https://www.enbridge.com/projects-and-infrastructure/public-awareness/minnesota-projects Line 3 Replacement Project (U.S.)] | ||
+ | |||
+ | [[category:Pipeline]] | ||
+ | [[category:Canada]] | ||
+ | [[category:USA]] | ||
+ | [[category:Enbridge]] |
Latest revision as of 15:57, 27 September 2023
Contents
Summary Information
- Source: Edmonton, Alberta, Canada
- Destination: Superior, Wisconsin, USA
- Ownership: Enbridge
- Website: http://www.enbridge.com/
- Length: 1,031 mile (1,660 kilometres)
- Capacity: barrels of oil per day
- Crude Type:
Brief Description
- Line 3 is a 1,031 mile (1,660 kilometres), 34-inch diameter pipeline that has been in operation since 1968.
- The pipeline goes from Edmonton, Alberta, Canada, to Superior, Wisconsin, with 365 miles of pipeline is in the United States.
- It is one of six crude oil pipelines that make up the Enbridge mainline system.
Pipeline Status
- The $2.9-billion U.S. portion of the Line 3 Replacement Program, known as the Line 3 Replacement Project, consists of replacing existing 34-inch pipe with new 36-inch pipe for 13 miles in North Dakota, 337 miles in Minnesota, and 14 miles in Wisconsin. The Wisconsin portion was completed in 2018.
History
- 2014 - Enbridge announces $7 Billion replacement project
- 2020 - Permits given for Minnesota leg of replacement project
- 2021 - Replacement project completed
Other Information
- -
Links
- EIA Liquids Pipeline Projects 2021-2025
- Enbridge to Undertake $7 Billion Mainline Replacement Program
- Enbridge Finalizes $7.5 Billion Mainline Replacement Program Cost Estimate; Issues CDN$400 Million of Common Equity
- Enbridge Line 3 Replacement Project Receives MPCA Approvals and Remaining DNR Permits
- Line 3 Replacement Project (U.S.)