OAO TatneftHydrocrackingComplex, 2.9 MTA – 2014
+
* '''[[Taneco Nizhnekamsk Refinery]]'''
OAO VNIPIneft Scope of Work: Authority Engineering,DetailedDesign, Procurement, Supervision.
+
** OAO TatneftHydrocrackingComplex, 2.9 MTA – 2014
ZAO RNPK VGO Hydrocracking Complex,2 MTA – 2014
+
** Scope of Work: Authority Engineering,Detailed Design, Procurement, Supervision.
OAO VNIPIneft Scope of Work: Authority Engineering
+
* '''[[Ryazan Refinery]]'''
Sulfur Recovery Unit at the MMC Norilsk Nickel Polar Division Copper Plant - 2014
+
** ZAO RNPK VGO Hydrocracking Complex,2 MTA – 2014
OAOVNIPIneftScopeofWork: AuthorityEngineering
+
** Scope of Work: Authority Engineering
OOO LUKOIL-Volgogradneftepererabotka Integrated CDU/VDU, 6 MTA - 2014
+
* '''[[Volgograd Refinery]]'''
OAOVNIPIneftScopeofWork: Authority Engineering and Detailed Design
+
** OOO LUKOIL-Volgogradneftepererabotka Integrated CDU/VDU, 6 MTA - 2014
OAO Gazprom Neft – Moscow Refinery Isomerization Unit, 650 kTA – 2013
+
** Scope of Work: Authority Engineering and Detailed Design
OAOVNIPIneftScopeofWork: Basic Design Acceptance, Detailed Design,Supervision
+
* '''[[Moscow Refinery]]'''
OAO Gazprom Neft – Moscow Refinery Diesel Hydrotreating Unit, 320 kTA- 2013
+
** OAO Gazprom Neft – Moscow Refinery Isomerization Unit, 650 kTA – 2013
OAOVNIPIneftScopeofWork: Authority Engineering and Detailed Design, Supervision
+
** OAOVNIPIneftScopeofWork: Basic Design Acceptance, Detailed Design,Supervision
OOO LUKOIL-Volgogradneftepererabotka Atmospheric – Vacuum Distillation Unit - 2012
+
* '''[[Moscow Refinery]]'''
OAOVNIPIneftScopeofWork: Authority Engineering
+
** OAO Gazprom Neft – Moscow Refinery Diesel Hydrotreating Unit, 320 kTA- 2013
OAO Angarskneftekhimproyekt Diesel Hydrotreating Unit- 2012
+
** Scope of Work: Authority Engineering and Detailed Design, Supervision
OAOVNIPIneftScopeofWork: Authority Engineering
+
* '''[[Volgograd Refinery]]'''
OAO Gazprom Neft – Moscow RefineryPSA Unit - 2011
+
** OOO LUKOIL-Volgogradneftepererabotka Atmospheric – Vacuum Distillation Unit - 2012
OAOVNIPIneftScopeofWork:Authority Engineering and Detailed Design, Supervision
+
** Scope of Work: Authority Engineering
OJSC TANECO CDU/VDU, 7 MTA - 2010
+
* '''[[Angarsk Petrochemical Refinery]]'''
OAOVNIPIneftScopeofWork: Basic Design, Authority Engineering and Detailed Design, Procurement, Supervision
+
** OAO Angarskneftekhimproyekt Diesel Hydrotreating Unit- 2012
OOO PO Kirishinefteorgsintez
+
** Scope of Work: Authority Engineering
Capacity: 4.9 MTA (vacuum distillation), 2.2 MTA (visbreaking)
+
* '''[[Moscow Refinery]]'''
OAOVNIPIneftScopeofWork: Basic Design Acceptance; Detailed Design, Procurement.
+
** OAO Gazprom Neft – Moscow Refinery PSA Unit - 2011
Commissioningdate: 2009
+
** Scope of Work: Authority Engineering and Detailed Design, Supervision
ZAO RNPK Deep Conversion Complex
+
* '''[[Taneco Nizhnekamsk Refinery]]'''
Capacity: 2.5 MTA
+
** OJSC TANECO CDU/VDU, 7 MTA - 2010
OAOVNIPIneftScopeofWork: BasicDesignAcceptance, AuthorityEngineeringandDetailedDesign(jointlywithCB&ILummus); Procurement; Supervision.
+
** Scope of Work: Basic Design, Authority Engineering and Detailed Design, Procurement, Supervision
Commissioningdate: 2005-2006
+
* '''[[Kirishi Refinery]]'''
OAO TAIF-NK Catalytic Cracking Complex
+
** OOO PO Kirishinefteorgsintez
Capacity: 850 kTA
+
** Capacity: 4.9 MTA (vacuum distillation), 2.2 MTA (visbreaking)
OAOVNIPIneftScopeofWork: ActingasaGeneralDesigner; BasicDesign(jointly with OAO VNIINP);DetailedDesign; Procurement; Supervision.
+
** Scope of Work: Basic Design Acceptance; Detailed Design, Procurement.
Commissioningdate: 2005
+
** Commissioning date: 2009
* [[Yanos Yaroslavl Refinery]]
+
* '''[[Ryazan Refinery]]'''
 +
** ZAO RNPK Deep Conversion Complex
 +
** Capacity: 2.5 MTA
 +
** Scope of Work: Basic Design Acceptance, Authority Engineering and Detailed Design (jointly with CB&I Lummus); Procurement; Supervision.
 +
** Commissioning date: 2005-2006
 +
* '''[[Nizhnekamsk Refinery]]'''
 +
** OAO TAIF-NK Catalytic Cracking Complex
 +
** Capacity: 850 kTA
 +
** Scope of Work: Acting as a General Designer; Basic Design(jointly with OAO VNIINP);Detailed Design; Procurement; Supervision.
 +
** Commissioning date: 2005
 +
* '''[[Yanos Yaroslavl Refinery]]'''
 
** OAO Slavneft-Yaroslavnefteorgsintez Deep Conversion Complex
 
** OAO Slavneft-Yaroslavnefteorgsintez Deep Conversion Complex
 
** Capacity: 2.1 MTA
 
** Capacity: 2.1 MTA
 
** Scope of Work: Basic Design Acceptance, Detailed Design(jointly with Toyo Engineering Corporation);  Supervision.
 
** Scope of Work: Basic Design Acceptance, Detailed Design(jointly with Toyo Engineering Corporation);  Supervision.
 
** Commissioning date: 2005
 
** Commissioning date: 2005
OOO LUKOIL-Permnefteorgsintez VGO Hydrocracking Complex
+
* '''[[Perm Refinery]]'''
Capacity: 3.5 MTA - Plant
+
** OOO LUKOIL-Permnefteorgsintez VGO Hydrocracking Complex
OAOVNIPIneftScopeofWork: ActingasaGeneralDesigner; Basic Design Acceptance; DetailedDesign, Procurement, Supervision.
+
** Capacity: 3.5 MTA - Plant
Commissioning date: 2004
+
** Scope of Work: Acting as a General Designer; Basic Design Acceptance; Detailed Design, Procurement, Supervision.
ZAO RNPK Catalytic Cracking Complex  Capacity: 2.5 MTA
+
** Commissioning date: 2004
OAOVNIPIneftScopeofWork: DetailedDesign, Supervision.
+
* '''[[Ryazan Refinery]]'''
Commissioning date: 2001
+
** ZAO RNPK Catalytic Cracking Complex  Capacity: 2.5 MTA
 +
** Scope of Work: Detailed Design, Supervision.
 +
** Commissioning date: 2001
  
 
# [http://www.vnipineft.ru/en/engineering-experience/key-projects/oil-refining/ ]
 
# [http://www.vnipineft.ru/en/engineering-experience/key-projects/oil-refining/ ]
 +
 +
[[Category:Engineering]]

Latest revision as of 18:03, 22 March 2020

  • Taneco Nizhnekamsk Refinery
    • OAO TatneftHydrocrackingComplex, 2.9 MTA – 2014
    • Scope of Work: Authority Engineering,Detailed Design, Procurement, Supervision.
  • Ryazan Refinery
    • ZAO RNPK VGO Hydrocracking Complex,2 MTA – 2014
    • Scope of Work: Authority Engineering
  • Volgograd Refinery
    • OOO LUKOIL-Volgogradneftepererabotka Integrated CDU/VDU, 6 MTA - 2014
    • Scope of Work: Authority Engineering and Detailed Design
  • Moscow Refinery
    • OAO Gazprom Neft – Moscow Refinery Isomerization Unit, 650 kTA – 2013
    • OAOVNIPIneftScopeofWork: Basic Design Acceptance, Detailed Design,Supervision
  • Moscow Refinery
    • OAO Gazprom Neft – Moscow Refinery Diesel Hydrotreating Unit, 320 kTA- 2013
    • Scope of Work: Authority Engineering and Detailed Design, Supervision
  • Volgograd Refinery
    • OOO LUKOIL-Volgogradneftepererabotka Atmospheric – Vacuum Distillation Unit - 2012
    • Scope of Work: Authority Engineering
  • Angarsk Petrochemical Refinery
    • OAO Angarskneftekhimproyekt Diesel Hydrotreating Unit- 2012
    • Scope of Work: Authority Engineering
  • Moscow Refinery
    • OAO Gazprom Neft – Moscow Refinery PSA Unit - 2011
    • Scope of Work: Authority Engineering and Detailed Design, Supervision
  • Taneco Nizhnekamsk Refinery
    • OJSC TANECO CDU/VDU, 7 MTA - 2010
    • Scope of Work: Basic Design, Authority Engineering and Detailed Design, Procurement, Supervision
  • Kirishi Refinery
    • OOO PO Kirishinefteorgsintez
    • Capacity: 4.9 MTA (vacuum distillation), 2.2 MTA (visbreaking)
    • Scope of Work: Basic Design Acceptance; Detailed Design, Procurement.
    • Commissioning date: 2009
  • Ryazan Refinery
    • ZAO RNPK Deep Conversion Complex
    • Capacity: 2.5 MTA
    • Scope of Work: Basic Design Acceptance, Authority Engineering and Detailed Design (jointly with CB&I Lummus); Procurement; Supervision.
    • Commissioning date: 2005-2006
  • Nizhnekamsk Refinery
    • OAO TAIF-NK Catalytic Cracking Complex
    • Capacity: 850 kTA
    • Scope of Work: Acting as a General Designer; Basic Design(jointly with OAO VNIINP);Detailed Design; Procurement; Supervision.
    • Commissioning date: 2005
  • Yanos Yaroslavl Refinery
    • OAO Slavneft-Yaroslavnefteorgsintez Deep Conversion Complex
    • Capacity: 2.1 MTA
    • Scope of Work: Basic Design Acceptance, Detailed Design(jointly with Toyo Engineering Corporation); Supervision.
    • Commissioning date: 2005
  • Perm Refinery
    • OOO LUKOIL-Permnefteorgsintez VGO Hydrocracking Complex
    • Capacity: 3.5 MTA - Plant
    • Scope of Work: Acting as a General Designer; Basic Design Acceptance; Detailed Design, Procurement, Supervision.
    • Commissioning date: 2004
  • Ryazan Refinery
    • ZAO RNPK Catalytic Cracking Complex Capacity: 2.5 MTA
    • Scope of Work: Detailed Design, Supervision.
    • Commissioning date: 2001