Difference between revisions of "Ruwais LNG Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 19: | Line 19: | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | * Commissioning is expected in [[LNG Terminal Projects to be Completed in | + | * Commissioning is expected in [[LNG Terminal Projects to be Completed in 2028 | 2028]] |
=== Suppliers / Customers === | === Suppliers / Customers === |
Revision as of 16:40, 14 March 2024
Contents
Summary Information
- Ownership: ADNOC
- Website: https://www.adnoc.ae/
- Wikipage: ADGAS Das Island LNG Terminal
- Location: Al Ruwais Industrial City, Al Dhafrah, Abu Dhabi
- Capacity: million tons/annum
- Status: Planned
Brief Description
- The Ruwais LNG project consists of two 4.8 million metric tons per annum (mtpa) natural gas liquefaction trains with a total capacity of 9.6 mtpa of LNG.
Technical Details
- Storage capacity:
- Constructor:
- Baker Hughes: Provision two electric liquefaction systems
- Technip Energies, JGC Corporation and National Petroleum Construction Company: EPC contract
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 2028
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2024 - Notice to proceeed for EPC contractors
Other Information
- -