Difference between revisions of "Shedgum Yanbu NGL pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 17: | Line 17: | ||
=== History === | === History === | ||
− | * - | + | * 2014 - Saipem awarded EPC contract for capacity expansion |
=== Other Information === | === Other Information === | ||
Line 25: | Line 25: | ||
=== Links === | === Links === | ||
− | # - | + | # [https://abarrelfull.blogspot.com/2024/03/saipem-awarded-e-contracts-for.html Saipem awarded E&C contracts for approximately $4 billion] |
[[category:Pipeline]] | [[category:Pipeline]] | ||
[[category:Saudi Arabia]] | [[category:Saudi Arabia]] | ||
[[category:Saudi Aramco]] | [[category:Saudi Aramco]] |
Latest revision as of 16:19, 11 March 2024
Contents
Summary Information
- Source: Shedgum
- Destination: Yanbu
- Ownership: Aramco
- Website:
- Length: 1,166 kilometres ( miles)
- Capacity: barrels of oil per day
- Crude Type: NGLs
Brief Description
- The pipeline transports natural gas liquids (NGLs) from the Shedgum Gas Processing Plant on the gulf coast to the Yanbu NGL Plant on the Red Sea coast
Pipeline Status
- In operation
History
- 2014 - Saipem awarded EPC contract for capacity expansion
Other Information
- -