Difference between revisions of "Shaybah Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Saudi Aramco | * Operator: Saudi Aramco | ||
* Country: Saudi-Arabia | * Country: Saudi-Arabia | ||
Line 9: | Line 9: | ||
* Production Volume: 1,000,000 bpd | * Production Volume: 1,000,000 bpd | ||
− | + | === Description === | |
* The Shaybah field is located in the Rub’ Al-Khali desert in the south eastern part of the Kingdom, 800 kilometres from Dhahran making it Saudi Aramco’s most remote oil field | * The Shaybah field is located in the Rub’ Al-Khali desert in the south eastern part of the Kingdom, 800 kilometres from Dhahran making it Saudi Aramco’s most remote oil field | ||
* The field is approximately 13 kilometres wide and 64 kilometres long. | * The field is approximately 13 kilometres wide and 64 kilometres long. | ||
Line 15: | Line 15: | ||
* Associated gas is processed at the Sabkha NGL recovery plant | * Associated gas is processed at the Sabkha NGL recovery plant | ||
− | + | === Contractors === | |
− | * | + | * '''SNC-Lavalin:''' |
− | * | + | * '''GE:''' Supply of 11 gas turbine-generators, 44 compressors, motors and services |
− | * | + | * '''Samsung HE:''' Central Processing Facility Expansion |
− | + | === History === | |
+ | * 1968 - Shaybah Oil Field discovered | ||
* 2006 - SNC-Lavalin awarded a contract to design and build the Shaybah Central Processing Facilities (CPF) | * 2006 - SNC-Lavalin awarded a contract to design and build the Shaybah Central Processing Facilities (CPF) | ||
* 2014 - Samsung awarded Central Processing Facility Expansion contract | * 2014 - Samsung awarded Central Processing Facility Expansion contract | ||
* 2106 - Expansion completed | * 2106 - Expansion completed | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
+ | # [https://www.aramco.com/en/what-we-do/mega-projects/shaybah-oil-field-recovery-plant Shaybah, Aramco] | ||
# [http://killajoules.wikidot.com/archive:snc-lavalin-awarded-contract-for-the-shaybah-expansi SNC-Lavalin Awarded Contract For The Shaybah Expansion Program In Saudi Arabia] | # [http://killajoules.wikidot.com/archive:snc-lavalin-awarded-contract-for-the-shaybah-expansi SNC-Lavalin Awarded Contract For The Shaybah Expansion Program In Saudi Arabia] | ||
# [http://killajoules.wikidot.com/archive:saudi-aramco-selects-ge-for-500-million-expansion-ag Saudi Aramco Selects GE for $500 Million Expansion Agreements] | # [http://killajoules.wikidot.com/archive:saudi-aramco-selects-ge-for-500-million-expansion-ag Saudi Aramco Selects GE for $500 Million Expansion Agreements] |
Revision as of 09:16, 6 March 2024
Summary Information
- Operator: Saudi Aramco
- Country: Saudi-Arabia
- Location:
- Production start: 1998
- Partners:
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume: 1,000,000 bpd
Description
- The Shaybah field is located in the Rub’ Al-Khali desert in the south eastern part of the Kingdom, 800 kilometres from Dhahran making it Saudi Aramco’s most remote oil field
- The field is approximately 13 kilometres wide and 64 kilometres long.
- It produces Arabian Extra Light crude. The crude is processed at the Abqaiq Oil Processing Plant
- Associated gas is processed at the Sabkha NGL recovery plant
Contractors
- SNC-Lavalin:
- GE: Supply of 11 gas turbine-generators, 44 compressors, motors and services
- Samsung HE: Central Processing Facility Expansion
History
- 1968 - Shaybah Oil Field discovered
- 2006 - SNC-Lavalin awarded a contract to design and build the Shaybah Central Processing Facilities (CPF)
- 2014 - Samsung awarded Central Processing Facility Expansion contract
- 2106 - Expansion completed