Difference between revisions of "Muda Jengka Gas and Condensate Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: CPOC * Country: Malaysia / Thailand * Location: Block B-17 * Production start: 2010 * Partners: PTTEP and Petronas * Type: Gas & Condensate * E...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: CPOC | * Operator: CPOC | ||
* Country: Malaysia / Thailand | * Country: Malaysia / Thailand | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The Muda and Jengka Field is located offshore in the Gulf of Thailand approximately 150 km Northeast to Kota Bharu, 250 km East of Songkhla province and 350 km North of Kemaman Supply Base (KSB) in water-depth of ranging between 55-65 meters in contract area of Block B-17 in the Joint Development Area. | * The Muda and Jengka Field is located offshore in the Gulf of Thailand approximately 150 km Northeast to Kota Bharu, 250 km East of Songkhla province and 350 km North of Kemaman Supply Base (KSB) in water-depth of ranging between 55-65 meters in contract area of Block B-17 in the Joint Development Area. | ||
* The Muda and Jengka field development project consists of: | * The Muda and Jengka field development project consists of: | ||
Line 19: | Line 19: | ||
* **FSO Ratu Songkhla** has storage capacity of 546,000 barrels of oil | * **FSO Ratu Songkhla** has storage capacity of 546,000 barrels of oil | ||
− | + | === Contractors === | |
* **MMHE:** MUDA Processing Platform Jacket | * **MMHE:** MUDA Processing Platform Jacket | ||
* **Keppel:** Conversion of FSO Ratu Songkhla, including installation of the metering skid as well as the fabrication and installation of an external turret mooring system, cargo offloading station and helideck | * **Keppel:** Conversion of FSO Ratu Songkhla, including installation of the metering skid as well as the fabrication and installation of an external turret mooring system, cargo offloading station and helideck | ||
Line 25: | Line 25: | ||
* **Oil Line Eng:** Construction of wellhead platforms | * **Oil Line Eng:** Construction of wellhead platforms | ||
− | + | === History === | |
* 2008 - M3nergy awarded FSO contract | * 2008 - M3nergy awarded FSO contract | ||
Line 31: | Line 31: | ||
* 2010 - Production launched | * 2010 - Production launched | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [http://www.mtja.org/development.php Malaysia-Thailand Joint Authority (MTJA)] | # [http://www.mtja.org/development.php Malaysia-Thailand Joint Authority (MTJA)] | ||
# [[Jotun FPSO References]] | # [[Jotun FPSO References]] | ||
Line 41: | Line 41: | ||
# [[International Protective Coatings Fixed Platform References]] | # [[International Protective Coatings Fixed Platform References]] | ||
# [[Keppel FPSO References]] | # [[Keppel FPSO References]] | ||
+ | # [[Petrofac-RNZ Offshore and Platform References]] | ||
# [http://killajoules.wikidot.com/archive:m3nergy-bags-rm954m-fso-lease M3nergy bags RM954m FSO lease] | # [http://killajoules.wikidot.com/archive:m3nergy-bags-rm954m-fso-lease M3nergy bags RM954m FSO lease] | ||
# [http://killajoules.wikidot.com/archive:the-eight-legged-jacket-sailed-away The Eight Legged Jacket Sailed Away] | # [http://killajoules.wikidot.com/archive:the-eight-legged-jacket-sailed-away The Eight Legged Jacket Sailed Away] | ||
# [http://killajoules.wikidot.com/archive:keppel-on-track-to-complete-fso-conversion-for-malay Keppel on track to complete FSO conversion for Malaysia’s M3nergy] | # [http://killajoules.wikidot.com/archive:keppel-on-track-to-complete-fso-conversion-for-malay Keppel on track to complete FSO conversion for Malaysia’s M3nergy] | ||
# [http://killajoules.wikidot.com/archive:commencement-of-malaysia-thailand-joint-development Commencement of Malaysia-Thailand Joint Development Area project B-17 Gas Production] | # [http://killajoules.wikidot.com/archive:commencement-of-malaysia-thailand-joint-development Commencement of Malaysia-Thailand Joint Development Area project B-17 Gas Production] |
Latest revision as of 07:52, 22 February 2024
Summary Information
- Operator: CPOC
- Country: Malaysia / Thailand
- Location: Block B-17
- Production start: 2010
- Partners: PTTEP and Petronas
- Type: Gas & Condensate
- Estimated Reserves:
- Production Volume:
Description
- The Muda and Jengka Field is located offshore in the Gulf of Thailand approximately 150 km Northeast to Kota Bharu, 250 km East of Songkhla province and 350 km North of Kemaman Supply Base (KSB) in water-depth of ranging between 55-65 meters in contract area of Block B-17 in the Joint Development Area.
- The Muda and Jengka field development project consists of:
- Four Wellhead Platforms (Muda-A [MDA], Muda-B [MDB], Muda-C [MDC] and Jengka-A [JKA])
- Muda Central Processing Platform (MDPP)
- Living Quarters (MDLQ)
- Flare Tripod
- FSO (Ratu Songkhla).
- **FSO Ratu Songkhla** has storage capacity of 546,000 barrels of oil
Contractors
- **MMHE:** MUDA Processing Platform Jacket
- **Keppel:** Conversion of FSO Ratu Songkhla, including installation of the metering skid as well as the fabrication and installation of an external turret mooring system, cargo offloading station and helideck
- **Jurong:** Muda CPP construction
- **Oil Line Eng:** Construction of wellhead platforms
History
- 2008 - M3nergy awarded FSO contract
- 2009 - FSO conversion completed
- 2010 - Production launched
Geology
Links
- Malaysia-Thailand Joint Authority (MTJA)
- Jotun FPSO References
- London Marine FPSO References
- International Protective Coatings Asia Fixed Platform Refere
- International Protective Coatings Fixed Platform References
- Keppel FPSO References
- Petrofac-RNZ Offshore and Platform References
- M3nergy bags RM954m FSO lease
- The Eight Legged Jacket Sailed Away
- Keppel on track to complete FSO conversion for Malaysia’s M3nergy
- Commencement of Malaysia-Thailand Joint Development Area project B-17 Gas Production