Difference between revisions of "Saguaro Energía LNG Export Terminal"

From A Barrel Full
Jump to navigation Jump to search
 
(5 intermediate revisions by the same user not shown)
Line 5: Line 5:
 
* Location: Puerto Libertad, Sonora, Mexico
 
* Location: Puerto Libertad, Sonora, Mexico
 
* Capacity: 14.1 million tons/annum  
 
* Capacity: 14.1 million tons/annum  
* Status: (In Operation / Planned / Under Construction)
+
* Status: (Planned)
  
 
=== Brief Description ===
 
=== Brief Description ===
 
* A three train onshore facility, that will be built in two phases, first two trains followed by a third
 
* A three train onshore facility, that will be built in two phases, first two trains followed by a third
 +
* The 500-mile [[Sierra Madre Gas Pipeline]] will be utilized as the primary natural gas supply path for the transportation of up to 2.8 Bcf/d natural gas from the U.S. border to the facility
  
 
=== Technical Details ===
 
=== Technical Details ===
 
* Storage capacity:
 
* Storage capacity:
 
* Constructor:
 
* Constructor:
* Licensor:
+
** '''Bechtel:''' Engineering design
 +
** '''GDI Sicim Pipelines and Bonatti:''' Engineering, Procurement, and Construction (“EPC”) contract for the Sierra Madre pipeline project
 +
* Licensor: [[LNG Terminals Using Phillips Optimised Cascade Technology | Conocophillips]]
  
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===
Line 19: Line 22:
  
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
* Suppliers:  
+
* Suppliers: Gas will be supplied from the Permian basin
* Customers: Exxon will buy 2 million tonnes per annum
+
* Customers:  
 +
** Exxon will buy 2 million tonnes per annum
 +
** Woodside will buy 1.3mtpa for 20 years
  
 
=== History ===
 
=== History ===
* 2023 - Sales agreement sugned with Exxon
+
* 2021 - Agreements signed with Conocophillips and Bechtel for licencing and construction
 +
* 2023 - Sales agreements signed with Exxon, Shell and Woodside
  
 
=== Other Information ===
 
=== Other Information ===
Line 29: Line 35:
  
 
=== Links ===
 
=== Links ===
 +
# [https://abarrelfull.blogspot.com/2023/02/mexico-pacific-limited-announces.html Mexico Pacific Limited Announces Collaboration with ConocoPhillips LNG Licensing and Bechtel to Champion Low Carbon LNG]
 
# [https://lng-news.blogspot.com/2023/02/mexico-pacific-and-exxonmobil-execution.html Mexico Pacific and ExxonMobil Execution of Long-Term LNG Sales and Purchase Agreements]
 
# [https://lng-news.blogspot.com/2023/02/mexico-pacific-and-exxonmobil-execution.html Mexico Pacific and ExxonMobil Execution of Long-Term LNG Sales and Purchase Agreements]
 +
# [https://lng-news.blogspot.com/2023/03/mexico-pacific-and-shell-sign-third.html Mexico Pacific and Shell sign third long-term LNG sales and purchase agreement]
 +
# [https://lng-news.blogspot.com/2023/11/mexico-pacific-awards-sierra-madre.html Mexico Pacific Awards Sierra Madre Pipeline EPC Contract to GDI SICIM PIPELINES and BONATTI]
 +
# [https://lng-news.blogspot.com/2023/12/woodside-and-mexico-pacific-sign-lng.html Woodside and Mexico Pacific sign LNG supply agreement]
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:Mexico]]
 
[[category:Mexico]]

Latest revision as of 09:08, 17 January 2024

Summary Information

  • Ownership: Mexico Pacific
  • Website: https://mexicopacific.com/
  • Location: Puerto Libertad, Sonora, Mexico
  • Capacity: 14.1 million tons/annum
  • Status: (Planned)

Brief Description

  • A three train onshore facility, that will be built in two phases, first two trains followed by a third
  • The 500-mile Sierra Madre Gas Pipeline will be utilized as the primary natural gas supply path for the transportation of up to 2.8 Bcf/d natural gas from the U.S. border to the facility

Technical Details

  • Storage capacity:
  • Constructor:
    • Bechtel: Engineering design
    • GDI Sicim Pipelines and Bonatti: Engineering, Procurement, and Construction (“EPC”) contract for the Sierra Madre pipeline project
  • Licensor: Conocophillips

Ongoing Projects/Project Status

  • Commissioning is expected in 202X

Suppliers / Customers

  • Suppliers: Gas will be supplied from the Permian basin
  • Customers:
    • Exxon will buy 2 million tonnes per annum
    • Woodside will buy 1.3mtpa for 20 years

History

  • 2021 - Agreements signed with Conocophillips and Bechtel for licencing and construction
  • 2023 - Sales agreements signed with Exxon, Shell and Woodside

Other Information

  • -

Links

  1. Mexico Pacific Limited Announces Collaboration with ConocoPhillips LNG Licensing and Bechtel to Champion Low Carbon LNG
  2. Mexico Pacific and ExxonMobil Execution of Long-Term LNG Sales and Purchase Agreements
  3. Mexico Pacific and Shell sign third long-term LNG sales and purchase agreement
  4. Mexico Pacific Awards Sierra Madre Pipeline EPC Contract to GDI SICIM PIPELINES and BONATTI
  5. Woodside and Mexico Pacific sign LNG supply agreement