#* 2007  
 
#* 2007  
 
#* 2,300 tons  
 
#* 2,300 tons  
# [[Saxi Batuque FPSO]]
+
# [[Saxi-Batuque FPSO]]
 
#* SBM   
 
#* SBM   
 
#* Seven units of topside modules  
 
#* Seven units of topside modules  
Line 248: Line 248:
 
#* 2016
 
#* 2016
 
#* 10,100 tons (heaviest module weighs near to 2,400 tons)
 
#* 10,100 tons (heaviest module weighs near to 2,400 tons)
 +
# [[Catcher FPSO]]
 +
#* BW Offshore
 +
#* 12 Topside Modules & Development Turret Module
 +
#* 2016
 +
#* Total Weight 11,400 tons (heaviest module weighs near to 2,000 tons)
 +
# [[Culzean Ailsa FSO]]
 +
#* MODEC
 +
#* 4 Topside Modules
 +
#* 2017
 +
#* Total Weight 1,300 tons
 +
# [[Leviathan Gas Field]]
 +
#* Cameron Solutions / Schlumberger
 +
#* Mono-Ethylene Glycol (MEG) Reclamation Module
 +
#* 2018
 +
#* Total Weight 2,200 tons
 +
# [[Liza Destiny FPSO]]
 +
#* SBM Offshore
 +
#* 12 Topside Modules
 +
#* 2019
 +
#* Total Weight 14,200 tons (heaviest module weighs near to 2,000 tons)
 +
# [[Miamte MV34 FPSO]]
 +
#* MODEC
 +
#* Fabrication of 5 topside modules
 +
#* 2021
 +
#* Total Weight Total module weights of 9,232 tons with the heaviest exceeding 2,780 tons
 
# [[Liza Unity FPSO]]
 
# [[Liza Unity FPSO]]
 
#* SBM
 
#* SBM
 
#* Fabrication of 13 modules with the heaviest weighing above 2,500 tons.  
 
#* Fabrication of 13 modules with the heaviest weighing above 2,500 tons.  
 
#* Delivered in January 2021.
 
#* Delivered in January 2021.

Latest revision as of 14:59, 18 December 2023

  1. Brasil FPSO
    • SBM
    • Six units of topside modules
    • 2002
    • 1,501 tons
  2. Four Vanguard FPSO
    • MERPRO
    • Main process module, process control equipment module and riser buoy, sponson and lantern frame
    • 2002
    • 757 tons
  3. Falcon FPSO
    • SBM
    • Four units of topside modules
    • 2002
    • 958 tons
  4. Serpentina FPSO
    • SBM
    • Eight units of topside modules
    • 2003
    • 2,500 tons
  5. Marlim Sul FPSO
    • SBM
    • Eight units of topside modules
    • 2003
    • 3,830 tons
  6. Modec Venture 11 FPSO
    • Technip Oceania Pty Ltd and Modec
    • Three units of topside modules
    • 2004
    • 1,271 tons
  7. Capixaba FPSO
    • SBM
    • Seven units of topside modules
    • 2005
    • 3,490 tons
  8. Kikeh FPSO
    • Malaysia Marine & Heavy Engineering Sdn Bhd
    • Four units of topside modules
    • 2006
    • 2,150 tons
  9. Polvo FPSO
    • Prosafe
    • Five units of topside modules
    • 2006
    • 2,715 tons
  10. Umuroa FPSO
    • Prosafe
    • Three units of topside modules
    • 2006
    • 1,232 tons
  11. PRA-1 Pumping Platform
    • Modec
    • One unit of topside module
    • 2006
    • 820 tons
  12. Stybarrow Venture MV16 FPSO
    • Modec
    • Four units of topside modules
    • 2007
    • 4,600 tons
  13. Mondo FPSO
    • SBM
    • Five units of topside modules
    • 2007
    • 2,300 tons
  14. Saxi-Batuque FPSO
    • SBM
    • Seven units of topside modules
    • 2007
    • 4,210 tons
  15. Espirito Santo BC 10 FPSO
    • SBM
    • Seven units of topside modules
    • 2008
    • 4,446 tons
  16. BW Pioneer FPSO
    • BW Offshore Limited
    • Four units of topside modules
    • 2009
    • 1,730 tons
  17. BW Pioneer FPSO
    • DPS (Bristol) Limited
    • Three units of topside modules
    • 2009
    • 1,900 tons
  18. Dynamic Producer FPSO
    • Petroserv S.A.
    • Five units of topside modules
      • 2009
    • 1,554 tons
  19. P 57 FPSO
    • SBM
    • Five units of topside modules
    • 2009
    • 4,463 tons
  20. Pazflor FPSO
    • VWS Westgarth Ltd
    • One unit of topside module and eight units of skids
    • 2009
    • 644 tons
  21. Capixaba FPSO
    • SBM Relocation (Cachalote)
    • Three units of topside modules
    • 2009
    • 1,005 tons
  22. Kwame Nkrumah Mv21 FPSO
    • Modec
    • Five units of topside modules and nine pipe racks
    • 2009
    • 6,100 tons
  23. Capixaba FPSO
    • VME Process Inc. Relocation (Cachalote)
    • Three topside modules
    • 2009
    • 673 tons
  24. Okha FPSO
    • SBM
    • Six units of topside modules
    • 2010
    • 3,504 tons
  25. Skarv FPSO
    • SBM
    • One unit of topside modules and pipes
    • 2010
    • 496 tons
  26. PSVM FPSO
    • Modec
    • Seventeen units of topside modules and five pipe racks
    • 2010
    • 16,002 tons
  27. PSVM FPSO
    • VWS Westgarth Ltd
    • Two units of topside modules
    • 2010
    • 1,100 tons
  28. Aseng FPSO
    • SBM
    • Eight units of topside modules
    • 2011
    • 7,125 tons
  29. Armada TGT 1 FPSO
    • Armada TGT Limited
    • Four units of topside modules
    • 2011
    • 2,998 tons
  30. Cidade De Anchieta FPSO
    • VWS Westgarth Ltd
    • One unit of topside module
    • 2011
    • 269 tons
  31. Cidade De Anchieta FPSO
    • SBM
    • Four units of topside modules
    • 2011
    • 1,885 tons
  32. Berantai FPSO
    • KEPPEL
    • Three units of topside modules
    • 2011
    • 1,890 tons
  33. Armada D1 FPSO
    • Bumi Armada
    • Four units of topside modules
    • 2012
    • 2,193 tons
  34. OSX 3 FPSO
    • Modec
    • Five units of topside modules
    • 2013
    • 3,532 tons
  35. OSX 2 FPSO
    • SBM
    • Twelve units of topside modules
    • 2013
    • 9,618 tons
  36. Cidade De Ilhabela FPSO
    • SBM
    • Four units of topside modules
    • 2013
    • 3,714 tons
  37. N'Goma FPSO
    • SBM
    • Five units of topside modules
    • 2013
    • 1,690 tons
  38. Armada Claire FPSO
    • Bumi Armada
    • Three units of topside modules
    • 2013
    • 1,148 tons
  39. BSP Champion 7, East Power Plant
    • Siemens
    • One unit of topside module
    • 2013
    • 1,022 tons
  40. Glen Lyon FPSO
    • SBM / BP
    • Turret and TER
    • 2013
    • 9,353 tons
  41. Cidade De Ilhabela FPSO
    • SBM
    • Eight units of topside modules
    • 2013
    • 5,213 tons
  42. Stones FPSO
    • Shell
    • Eight units of topside modules
    • 2014
    • 3,630 tons
  43. Cidade de Maricà FPSO
    • SBM
    • Eight + Five units of topside modules
    • 2014
    • 8,992 + 3,341 tons
  44. Cidade De Saquarema FPSO
    • SBM
    • Eight + Five units of topside modules
    • 2014
    • 8,992 + 3,341 tons
  45. Armada Sterling II FPSO
    • Bumi Armada
    • Three unit of topside modules
    • 2014
    • Total Weight 3,348 tons
  46. Malampaya Natural Gas Field
    • KEPPEL
    • Five unit of topside modules
    • 2014
    • Total Weight 2,496 tons
  47. Ten FPSO
    • Modec Inc
    • 2014
    • Total Weight 1,377 tons
  48. Kraken FPSO
    • Bumi Armada
    • 5 Topside Modules
    • 2016
    • Total Weight 7,000 tons (heaviest module weighs to 2,000 tons)
  49. Armada Olombendo FPSO
    • Bumi Armada
    • 6 Topside Modules
    • 2016
    • 10,100 tons (heaviest module weighs near to 2,400 tons)
  50. Catcher FPSO
    • BW Offshore
    • 12 Topside Modules & Development Turret Module
    • 2016
    • Total Weight 11,400 tons (heaviest module weighs near to 2,000 tons)
  51. Culzean Ailsa FSO
    • MODEC
    • 4 Topside Modules
    • 2017
    • Total Weight 1,300 tons
  52. Leviathan Gas Field
    • Cameron Solutions / Schlumberger
    • Mono-Ethylene Glycol (MEG) Reclamation Module
    • 2018
    • Total Weight 2,200 tons
  53. Liza Destiny FPSO
    • SBM Offshore
    • 12 Topside Modules
    • 2019
    • Total Weight 14,200 tons (heaviest module weighs near to 2,000 tons)
  54. Miamte MV34 FPSO
    • MODEC
    • Fabrication of 5 topside modules
    • 2021
    • Total Weight Total module weights of 9,232 tons with the heaviest exceeding 2,780 tons
  55. Liza Unity FPSO
    • SBM
    • Fabrication of 13 modules with the heaviest weighing above 2,500 tons.
    • Delivered in January 2021.