Difference between revisions of "Raia Manta and Raia Pintada Oil and Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 4: | Line 4: | ||
* Location: BM-C-33 area, in Campos Basin | * Location: BM-C-33 area, in Campos Basin | ||
* Production start: Planned 2028 | * Production start: Planned 2028 | ||
− | * Partners: | + | * Partners: Equinor 35 % (operator), Repsol Sinopec Brasil 35 %, Petrobras 30% |
* Type: Oil and Gas | * Type: Oil and Gas | ||
* Estimated Reserves: | * Estimated Reserves: | ||
Line 10: | Line 10: | ||
=== Description === | === Description === | ||
− | * | + | * The development concept comprises one floating production storage and offloading unit (FPSO) capable of processing gas and oil/condensate to meet sales specifications without further onshore processing. The FPSO will have a production capacity of 126.000 bpd of oil, 16 million cubic meters of gas per day with expected average exports of 14 million cubic meters of gas per day. |
+ | |||
=== Contractors === | === Contractors === | ||
Line 16: | Line 17: | ||
=== History === | === History === | ||
+ | * 2010 - Field discovered by Repsol Sinopec | ||
+ | * 2016 - Equinor became operator | ||
* 2023 - Equinor declares commerciality | * 2023 - Equinor declares commerciality | ||
Line 22: | Line 25: | ||
=== Links === | === Links === | ||
+ | # [https://abarrelfull.blogspot.com/2023/11/equinor-declares-commerciality-in-bm-c.html Equinor declares commerciality in the BM-C-33 area, in Campos Basin, Brazil] | ||
# [https://a-barrel-full.blogspot.com/2023/11/saipem-awarded-two-offshore-contracts.html Saipem awarded two offshore contracts worth approximately 1.9 billion USD] | # [https://a-barrel-full.blogspot.com/2023/11/saipem-awarded-two-offshore-contracts.html Saipem awarded two offshore contracts worth approximately 1.9 billion USD] | ||
Latest revision as of 17:11, 30 November 2023
Summary Information
- Operator: Equinor
- Country: Brazil
- Location: BM-C-33 area, in Campos Basin
- Production start: Planned 2028
- Partners: Equinor 35 % (operator), Repsol Sinopec Brasil 35 %, Petrobras 30%
- Type: Oil and Gas
- Estimated Reserves:
- Production Volume:
Description
- The development concept comprises one floating production storage and offloading unit (FPSO) capable of processing gas and oil/condensate to meet sales specifications without further onshore processing. The FPSO will have a production capacity of 126.000 bpd of oil, 16 million cubic meters of gas per day with expected average exports of 14 million cubic meters of gas per day.
Contractors
- Saipem: offshore transport and installation of a subsea gas export line and associated equipment in water depths of around 2,900 meters, as well as the horizontal drilling activities for the shore approach.
History
- 2010 - Field discovered by Repsol Sinopec
- 2016 - Equinor became operator
- 2023 - Equinor declares commerciality