Difference between revisions of "Montara Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: PTTEP * Country: Australia * Location: north-west coast of Australia * Production start: 2013 * Partners: * Type: Oil / Gas * Estimated Reserv...") |
(No difference)
|
Revision as of 07:02, 29 November 2023
Summary Information
- Operator: PTTEP
- Country: Australia
- Location: north-west coast of Australia
- Production start: 2013
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The project incorporates the Montara, Swift and Skua fields which are located approximately 690km West of Darwin in the Ashmore Cartier permit area of the Timor Sea within the AC/L7 and AC/L8 production licences in 80m of water.
- The MDP consists of the following infrastructure:
* An unmanned wellhead platform (WHP) at the Montara field with five (5) wells, three (3) 14 inch Production Risers, two (2) 6 inch Gas Lift Risers and one (1) 12 inch J-Tube; * Five (5) subsea wells for development of the Skua, Swift and Swallow fields; * Production flowline system consisting of two (2) 6- inch, one (1) 10 inch and three (3) 14 inch flowlines and associated tie-in spools; * Gas lift flowline system consisting of one (1) 6 inch and three (3) 4 inch flowlines and associated tie-in spools; * Three (3) infield control umbilicals and associated flying leads; * A subsea manifold in the Swift field for comingling the production fluids and distributing the compressed gas and electro-hydraulic services to the subsea wells; and * The [[[Montara Venture FPSO]]] facility and its associated mooring system located approximately 1.5 km northeast of the WHP. * Two (2) 10 inch Flexible Production Risers and associated riser bases. One (1) 6 inch Flexible Gas Lift Riser and associated riser base. Two (2) control umbilicals and associated riser bases. One (1) gas compressor for the gas lift system.
+++ Contractors
- **Clough:** transportation and installation of the 750te Montara Wellhead Platform deck, the 285te mooring buoy with nine associated mooring legs, approximately 26km of infield pipelines, and the 100te Swift subsea manifold
- **SCSE:** Jacket Fabrication
- **AusGroup:** Supply of supervision and labour for the offshore installation of the production platform topside, jacket and offshore pipeline
- **Saipem:** Wellhead platform and sealines
+++ History
- 2008 - PTT acquired Coogee Resources
- 2009 - An oil leak led to a major fire and Australia's worse oil spill
- 2013 - First oil produced
+++ Geology
+++ Links
- Saipem Fixed Offshore Production Facilities Project References
- Shenzhen Chiwan Sembawang Engineering Platform References
- Clough Awarded $116m Contract by PTTEP Australasia
- PTTEP’s subsidiary signs Share Sales Agreement to acquire Coogee Resources Limited
- AusGroup Secures AUD$12.0 million Contract for Construction Manning Services
- PTTEP report on crude oil and gas leak incident in Australia
- Commencement of Montara Production