Difference between revisions of "Santa Catarina LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 16: | Line 16: | ||
* Storage capacity: 160,000 cubic meters | * Storage capacity: 160,000 cubic meters | ||
* Unloading capacity: | * Unloading capacity: | ||
− | * Send out capacity: | + | * Send out capacity: 15 mcm of gas per day |
* Constructor: Tenenge built the connections to the local grid | * Constructor: Tenenge built the connections to the local grid | ||
Line 37: | Line 37: | ||
=== Links === | === Links === | ||
# [https://www.newfortressenergy.com/stories/santa-catarina-terminal-page Terminal Page, New Fortress Energy] | # [https://www.newfortressenergy.com/stories/santa-catarina-terminal-page Terminal Page, New Fortress Energy] | ||
− | https://abarrelfull.blogspot.com/2023/11/tenenge-starts-construction-of-gas.html Tenenge starts construction of Gas Terminal in Santa Catarina] | + | # [https://abarrelfull.blogspot.com/2023/11/tenenge-starts-construction-of-gas.html Tenenge starts construction of Gas Terminal in Santa Catarina] |
# [https://lng-news.blogspot.com/2023/11/new-fortress-energy-signs-fsru-charter.html New Fortress Energy Signs FSRU Charter to Start Operations of LNG Import Terminal in Santa Catarina, Brazil in January 2024] | # [https://lng-news.blogspot.com/2023/11/new-fortress-energy-signs-fsru-charter.html New Fortress Energy Signs FSRU Charter to Start Operations of LNG Import Terminal in Santa Catarina, Brazil in January 2024] | ||
Latest revision as of 13:23, 6 November 2023
Contents
Summary Information
- Ownership: New Fortress Energy
- Website: https://www.newfortressenergy.com/
- Location: Santa Catarina, Brazil
- Capacity: million tons/annum
- Status: Under construction
Brief Description
- The terminal utilises the Floating Storage and Regasification Unit (“FSRU”) Energos Winter which has the capacity to store 160,000 cubic meters of LNG.
- The TGS will be located 300 meters from the coast.
- After regasification, the natural gas continues for about 2 kilometers in a pipeline under the bed of the bay, until it flows into the same entry point of the OSPAR pipeline, in Itapoá
Technical Details
- Storage capacity: 160,000 cubic meters
- Unloading capacity:
- Send out capacity: 15 mcm of gas per day
- Constructor: Tenenge built the connections to the local grid
Ongoing Projects/Project Status
- The terminal is scheduled to start operations in January 2024.
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2021 - Construction was started
- 2023 - Charter signed for FSRU vessel
Other Information
-