Difference between revisions of "Yellowtail Oil Field"

From A Barrel Full
Jump to navigation Jump to search
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
* Country: Guyana
 
* Country: Guyana
 
* Location: Stabroek Block, Offshore
 
* Location: Stabroek Block, Offshore
* Production start:  
+
* Production start: Expected 2025
 
* Partners: Esso - 45 %, Hess - 30 % and CNOOC - 25 %
 
* Partners: Esso - 45 %, Hess - 30 % and CNOOC - 25 %
 
* Type: Oil / Gas
 
* Type: Oil / Gas
Line 10: Line 10:
  
 
=== Description ===
 
=== Description ===
* The development plan for Yellowtail includes up to three drill ships drilling up to 67 wells, a Floating Production, Storage, and Offloading Vessel (FPSO) and Subsea, Umbilicals, Risers, and Flowlines (SURF) production system, with tankers taking the oil to global markets
+
* The development plan for Yellowtail includes up to three drill ships drilling up to 67 wells, a Floating Production, Storage, and Offloading Vessel (FPSO), [[One Guyana FPSO]] and Subsea, Umbilicals, Risers, and Flowlines (SURF) production system, with tankers taking the oil to global markets
 +
* The FPSO is expected to have a storage capacity of 2 million barrels, and the development could produce 250,000 bpd
 
* This project will develop both the Yellowtail and Redtail fields
 
* This project will develop both the Yellowtail and Redtail fields
  
Line 17: Line 18:
  
 
=== History ===
 
=== History ===
 +
* 2019 - Yellowtail 1 discovered
 
* 2020 - Redtail and Yellowtail 2 discovered
 
* 2020 - Redtail and Yellowtail 2 discovered
 
* 2021 - Subsea contract awarded
 
* 2021 - Subsea contract awarded
 +
* 2023 - Chevron agreed to acquire Hess, becoming a partner
  
 
=== Geology ===
 
=== Geology ===
 +
* Yellowtail-1 encountered approximately 292 feet (89 meters) of high-quality oil-bearing sandstone reservoir and was drilled to a depth of 18,445 feet (5,622 meters) in 6,046 feet (1,843 meters) of water
 
* Redtail-1 encountered approximately 232 feet (70 meters) of high quality oil bearing sandstone and was drilled in 6,164 feet (1,878 meters) of water
 
* Redtail-1 encountered approximately 232 feet (70 meters) of high quality oil bearing sandstone and was drilled in 6,164 feet (1,878 meters) of water
 
* Yellowtail-2 encountered 69 feet (21 meters) of high quality oil bearing reservoirs
 
* Yellowtail-2 encountered 69 feet (21 meters) of high quality oil bearing reservoirs
  
 
=== Links ===
 
=== Links ===
# [ Hess Announces 13th Discovery Offshore Guyana]
+
# [https://abarrelfull.blogspot.com/2021/11/hess-announces-13th-discovery-offshore.html Hess Announces 13th Discovery Offshore Guyana]
 
# [https://abarrelfull.blogspot.com/2021/11/hess-announces-oil-discovery-at-redtail.html Hess Announces Oil Discovery at Redtail, Offshore Guyana]
 
# [https://abarrelfull.blogspot.com/2021/11/hess-announces-oil-discovery-at-redtail.html Hess Announces Oil Discovery at Redtail, Offshore Guyana]
 
# [https://a-barrel-full.blogspot.com/2021/11/technipfmc-awarded-large-subsea.html TechnipFMC Awarded Large Subsea Contract for Additional Stabroek Block project]
 
# [https://a-barrel-full.blogspot.com/2021/11/technipfmc-awarded-large-subsea.html TechnipFMC Awarded Large Subsea Contract for Additional Stabroek Block project]
 +
# [https://a-barrel-full.blogspot.com/2023/10/chevron-announces-agreement-to-acquire.html Chevron announces agreement to acquire Hess]
 +
 +
[[Category:Field]]
 +
[[Category:Guyana]]
 +
[[Category:Exxon]]

Latest revision as of 16:02, 23 October 2023

Summary Information

  • Operator: Exxon
  • Country: Guyana
  • Location: Stabroek Block, Offshore
  • Production start: Expected 2025
  • Partners: Esso - 45 %, Hess - 30 % and CNOOC - 25 %
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The development plan for Yellowtail includes up to three drill ships drilling up to 67 wells, a Floating Production, Storage, and Offloading Vessel (FPSO), One Guyana FPSO and Subsea, Umbilicals, Risers, and Flowlines (SURF) production system, with tankers taking the oil to global markets
  • The FPSO is expected to have a storage capacity of 2 million barrels, and the development could produce 250,000 bpd
  • This project will develop both the Yellowtail and Redtail fields

Contractors

  • TechnipFMC - Project management, engineering, manufacturing and testing capabilities to deliver the overall subsea production system. The scope of the project includes 51 enhanced vertical deepwater trees (EVDT) and associated tooling, as well as 12 manifolds and associated controls and tie-in equipment.

History

  • 2019 - Yellowtail 1 discovered
  • 2020 - Redtail and Yellowtail 2 discovered
  • 2021 - Subsea contract awarded
  • 2023 - Chevron agreed to acquire Hess, becoming a partner

Geology

  • Yellowtail-1 encountered approximately 292 feet (89 meters) of high-quality oil-bearing sandstone reservoir and was drilled to a depth of 18,445 feet (5,622 meters) in 6,046 feet (1,843 meters) of water
  • Redtail-1 encountered approximately 232 feet (70 meters) of high quality oil bearing sandstone and was drilled in 6,164 feet (1,878 meters) of water
  • Yellowtail-2 encountered 69 feet (21 meters) of high quality oil bearing reservoirs

Links

  1. Hess Announces 13th Discovery Offshore Guyana
  2. Hess Announces Oil Discovery at Redtail, Offshore Guyana
  3. TechnipFMC Awarded Large Subsea Contract for Additional Stabroek Block project
  4. Chevron announces agreement to acquire Hess