Difference between revisions of "Jackdaw Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: Shell * Country: * Location: * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: === De...") |
Abarrelfull (talk | contribs) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
* Operator: Shell | * Operator: Shell | ||
− | * Country: | + | * Country: United Kingdom |
* Location: | * Location: | ||
* Production start: | * Production start: | ||
* Partners: | * Partners: | ||
− | * Type: | + | * Type: Gas |
* Estimated Reserves: | * Estimated Reserves: | ||
* Production Volume: | * Production Volume: | ||
=== Description === | === Description === | ||
− | * | + | * The Jackdaw field is located approximately 250 km east of Aberdeen, Scotland, and is adjacent to the UK/Norway median line. |
+ | * The Jackdaw development consists of a new Wellhead Platform (WHP), four production wells and a 31 km pipeline from the Jackdaw WHP to the [[Shearwater Gas and Condensate Field | Shearwater gas hub]]. | ||
+ | * Peak production from the field is estimated at 40,000 barrels of oil equivalent per day. | ||
=== Contractors === | === Contractors === | ||
− | * - | + | * Aker Solutions |
+ | ** Front-end engineering and design work (FEED) | ||
+ | ** Engineering, procurement, construction, and installation (EPCI) of the complete wellhead platform, consisting of a topside and a steel jacket, as well as related load-out and offshore hook-up and commissioning. | ||
+ | * TechnipFMC | ||
+ | ** EPCI for the 30 kilometre tieback from the new Jackdaw platform the Shearwater platform, as well as an associated riser, spoolpieces, subsea structures, and umbilicals. | ||
=== History === | === History === | ||
− | * | + | * 2016 - Shell acquired BG Group, which previously owned the field |
+ | * 2017 - Siccar Point became a shareholder after acquiring OMV UK | ||
+ | * 2019 - FEED awarded | ||
+ | * 2022 - Approval granted for development | ||
+ | * 2022 - Final investment decision | ||
+ | * 2022 - Ithaca became a partner after buying Siccar Point | ||
=== Geology === | === Geology === | ||
Line 22: | Line 33: | ||
=== Links === | === Links === | ||
− | # | + | # [[UK Oil and Gas Fields by Approval Date]] |
+ | # [https://abarrelfull.blogspot.com/2023/09/recommended-cash-and-share-offer-for-bg.html Recommended cash and share offer for BG Group by Royal Dutch Shell] | ||
+ | # [https://abarrelfull.blogspot.com/2023/07/omv-closed-divestment-of-omv-uk-limited.html OMV closed the divestment of OMV (U.K.) Limited] | ||
+ | # [https://abarrelfull.blogspot.com/2023/03/shell-invests-in-jackdaw-gas-field-in.html Shell invests in the Jackdaw gas field in the UK North Sea] | ||
+ | # [https://abarrelfull.blogspot.com/2023/03/aker-solutions-asa-aker-solutions.html Aker Solutions ASA: Aker Solutions Awarded EPCI Contract for the Jackdaw Platform from Shell] | ||
+ | # [https://abarrelfull.blogspot.com/2023/03/technipfmc-awarded-significant-subsea.html TechnipFMC Awarded a Significant Subsea Contract for Shell’s North Sea Development] | ||
+ | # [https://abarrelfull.blogspot.com/2023/07/completion-of-acquisition-of-siccar.html Completion of Acquisition of Siccar Point Energy] | ||
Latest revision as of 06:43, 18 October 2023
Summary Information
- Operator: Shell
- Country: United Kingdom
- Location:
- Production start:
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Jackdaw field is located approximately 250 km east of Aberdeen, Scotland, and is adjacent to the UK/Norway median line.
- The Jackdaw development consists of a new Wellhead Platform (WHP), four production wells and a 31 km pipeline from the Jackdaw WHP to the Shearwater gas hub.
- Peak production from the field is estimated at 40,000 barrels of oil equivalent per day.
Contractors
- Aker Solutions
- Front-end engineering and design work (FEED)
- Engineering, procurement, construction, and installation (EPCI) of the complete wellhead platform, consisting of a topside and a steel jacket, as well as related load-out and offshore hook-up and commissioning.
- TechnipFMC
- EPCI for the 30 kilometre tieback from the new Jackdaw platform the Shearwater platform, as well as an associated riser, spoolpieces, subsea structures, and umbilicals.
History
- 2016 - Shell acquired BG Group, which previously owned the field
- 2017 - Siccar Point became a shareholder after acquiring OMV UK
- 2019 - FEED awarded
- 2022 - Approval granted for development
- 2022 - Final investment decision
- 2022 - Ithaca became a partner after buying Siccar Point
Geology
Links
- UK Oil and Gas Fields by Approval Date
- Recommended cash and share offer for BG Group by Royal Dutch Shell
- OMV closed the divestment of OMV (U.K.) Limited
- Shell invests in the Jackdaw gas field in the UK North Sea
- Aker Solutions ASA: Aker Solutions Awarded EPCI Contract for the Jackdaw Platform from Shell
- TechnipFMC Awarded a Significant Subsea Contract for Shell’s North Sea Development
- Completion of Acquisition of Siccar Point Energy