Difference between revisions of "Columbus Gas Field"

From A Barrel Full
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 10: Line 10:
  
 
=== Description ===
 
=== Description ===
*  
+
* The development consists of a single horizontal well which runs along the central axis of the reservoir
 +
* The Columbus well is connected to the Arran export pipeline through which Columbus production is exported along with Arran Field production. 
 +
* When production reaches the [[Shearwater Gas and Condensate Field | Shearwater platform]], it is separated into gas and condensate. 
 +
* The gas is exported to St Fergus via the SEGAL line and the condensate to Cruden Bay via the [[Forties Pipeline System]]
  
 
=== Contractors ===
 
=== Contractors ===
Line 19: Line 22:
  
 
=== Geology ===
 
=== Geology ===
*  
+
* The field produces from a gas-condensate reservoir in the Forties Sandstone Formation
  
 
=== Links ===
 
=== Links ===

Latest revision as of 09:25, 1 September 2023

Summary Information

  • Operator: Serica
  • Country: United Kingdom
  • Location:
  • Production start:
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The development consists of a single horizontal well which runs along the central axis of the reservoir
  • The Columbus well is connected to the Arran export pipeline through which Columbus production is exported along with Arran Field production.
  • When production reaches the Shearwater platform, it is separated into gas and condensate.
  • The gas is exported to St Fergus via the SEGAL line and the condensate to Cruden Bay via the Forties Pipeline System

Contractors

  • -

History

  • 2018 - Government approval granted

Geology

  • The field produces from a gas-condensate reservoir in the Forties Sandstone Formation

Links

  1. UK Oil and Gas Fields by Approval Date