Difference between revisions of "Deben Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Tullow * Country: UK * Location: Southern North Sea * Production start: 1998 * Partners: * Type: Gas * Estimated Reserves: recoverable reserv...") |
Abarrelfull (talk | contribs) |
||
Line 10: | Line 10: | ||
+++ Description | +++ Description | ||
− | * The field was developed via one subsea well tied back to the | + | * The field was developed via one subsea well tied back to the [[Thames Gas Field | Thames AR platform]]. The 'AR' platform provides metering and separation for gas from the development prior to processing and export via the Thames platform's existing facilities. |
+++ Contractors | +++ Contractors |
Latest revision as of 08:56, 24 August 2023
Summary Information
- Operator: Tullow
- Country: UK
- Location: Southern North Sea
- Production start: 1998
- Partners:
- Type: Gas
- Estimated Reserves: recoverable reserves of 33 billion cubic feet of gas (Original)
- Production Volume:
+++ Description
- The field was developed via one subsea well tied back to the Thames AR platform. The 'AR' platform provides metering and separation for gas from the development prior to processing and export via the Thames platform's existing facilities.
+++ Contractors
- -
+++ History
- 1997 - Approval Received for the Development
- 1998 - First gas is produced
- 2000 - BP sells equity to Tullow Oil
+++ Geology
+++ Links