Difference between revisions of "Kodiak Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Operator: | + | * Operator: Kosmos |
− | * Country: | + | * Country: USA |
− | * Location: | + | * Location: Mississippi Canyon Blocks 727 and 771, in the Gulf of Mexico |
* Production start: | * Production start: | ||
* Partners: | * Partners: | ||
Line 10: | Line 10: | ||
=== Description === | === Description === | ||
− | * | + | * The project consists of a subsea tie-back to the [[Devils Tower Oil and Gas Field | Devils Tower Truss Spar]] located in Mississippi Canyon Block 773 |
+ | * The Kodiak field is high temperature and pressure | ||
=== Contractors === | === Contractors === | ||
− | * - | + | * Technip: |
+ | ** fabrication(2) and installation of more than 12 kilometers of reeled bi-metallic flowline and riser, | ||
+ | ** installation of an 11-kilometer umbilical, associated terminations and flying leads, | ||
+ | ** pre-commissioning and testing for the rigid line, | ||
+ | ** crossings preparation along with pre-lay and post-lay survey. | ||
=== History === | === History === | ||
Line 26: | Line 31: | ||
[[category:Field]] | [[category:Field]] | ||
− | [[category: | + | [[category:USA]] |
− | [[category: | + | [[category:Kosmos]] |
Revision as of 11:01, 17 July 2023
Summary Information
- Operator: Kosmos
- Country: USA
- Location: Mississippi Canyon Blocks 727 and 771, in the Gulf of Mexico
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The project consists of a subsea tie-back to the Devils Tower Truss Spar located in Mississippi Canyon Block 773
- The Kodiak field is high temperature and pressure
Contractors
- Technip:
- fabrication(2) and installation of more than 12 kilometers of reeled bi-metallic flowline and riser,
- installation of an 11-kilometer umbilical, associated terminations and flying leads,
- pre-commissioning and testing for the rigid line,
- crossings preparation along with pre-lay and post-lay survey.
History
- 2014 - Technip awarded subsea contract