Difference between revisions of "Neptun Deep Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: * Country: * Location: * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: === Descrip...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Operator: | + | * Operator: OMV Petrom |
− | * Country: | + | * Country: Romania |
− | * Location: | + | * Location: Offshore Black Sea |
− | * Production start: | + | * Production start: 2027 (Scheduled) |
− | * Partners: | + | * Partners: OMV Petrom 50%, Romgaz 50% |
− | * Type: | + | * Type: Gas |
* Estimated Reserves: | * Estimated Reserves: | ||
− | * Production Volume: | + | * Production Volume: Plateau 8 BCM per annuam (expected) |
=== Description === | === Description === | ||
* The project involves the development of two natural gas fields, Domino and Pelican | * The project involves the development of two natural gas fields, Domino and Pelican | ||
− | * | + | * The infrastructure required for the development of the Domino and Pelican South offshore natural gas fields includes 10 wells, 3 subsea production systems and associated flow lines, an unmanned offshore platform, the main natural gas pipeline to Tuzla and a natural gas measurement station. |
* The gas processing facilities are located onshore. | * The gas processing facilities are located onshore. | ||
Line 18: | Line 18: | ||
=== History === | === History === | ||
− | * | + | * 2023 - Final investment decision |
=== Geology === | === Geology === | ||
Line 24: | Line 24: | ||
=== Links === | === Links === | ||
− | # | + | # [https://a-barrel-full.blogspot.com/2023/06/omv-petrom-and-romgaz-announce-decision.html OMV Petrom and Romgaz announce the decision to develop Neptun Deep, the largest natural gas project in the Romanian Black Sea] |
Revision as of 12:19, 22 June 2023
Summary Information
- Operator: OMV Petrom
- Country: Romania
- Location: Offshore Black Sea
- Production start: 2027 (Scheduled)
- Partners: OMV Petrom 50%, Romgaz 50%
- Type: Gas
- Estimated Reserves:
- Production Volume: Plateau 8 BCM per annuam (expected)
Description
- The project involves the development of two natural gas fields, Domino and Pelican
- The infrastructure required for the development of the Domino and Pelican South offshore natural gas fields includes 10 wells, 3 subsea production systems and associated flow lines, an unmanned offshore platform, the main natural gas pipeline to Tuzla and a natural gas measurement station.
- The gas processing facilities are located onshore.
Contractors
- -
History
- 2023 - Final investment decision