Difference between revisions of "Espadarte Sul Oil and Gas Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Petrobras * Country: Brazil * Location: Campos Basin * Production start: 2007 * Partners: * Type: Oil & Gas * Estimated Reserves: * Producti...")
 
(No difference)

Latest revision as of 07:15, 12 May 2023

Summary Information

  • Operator: Petrobras
  • Country: Brazil
  • Location: Campos Basin
  • Production start: 2007
  • Partners:
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The field utilises an FPSO capable of processing 100,000 barrels of oil per day, compressing 87 million cubic feet of natural gas per day and injecting 113,000 barrels of water per day
  • For details of Cidade De Rio De Janeiro Mv14 FPSO

+++ Contractors

  • **Keppel:** conversion of a Floating Production Storage and Offloading (FPSO) vessel
  • **MODEC:** Supply and operation of an FPSO

+++ History

  • 1999 - Keppel awarded Espadarte FPSO contract
  • 2005 - Petrobras Selects MODEC for the Supply and Operation of an FPSO and FSO
  • 2007 - First oil production

+++ Geology

+++ Links

  1. Petrobras Selects MODEC for the Supply and Operation of an FPSO and FSO, Offshore Brazil
  2. MODEC's FPSO Cidade do Rio de Janeiro MV14 Achieves First Oil
  3. Keppel Shipyard nears completion of FPSO conversion for SBM