Difference between revisions of "Uaru FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Name: | + | * Name: Uaru FPSO |
− | * Field: | + | * Field: [[Uaru_Oil_Field]] |
− | * Country: | + | * Country: Guyana |
* Ownership: | * Ownership: | ||
* Website: | * Website: | ||
− | * Field Operated By: | + | * Field Operated By: Exxon |
− | * Capacity: | + | * Capacity: 250,000 bpd |
* Year of Completion: | * Year of Completion: | ||
Line 18: | Line 18: | ||
=== Status === | === Status === | ||
− | * | + | * Planned |
=== History === | === History === |
Revision as of 06:51, 13 April 2023
Contents
Summary Information
- Name: Uaru FPSO
- Field: Uaru_Oil_Field
- Country: Guyana
- Ownership:
- Website:
- Field Operated By: Exxon
- Capacity: 250,000 bpd
- Year of Completion:
Brief Description
- The FPSO will be designed to produce 250,000 barrels of oil per day, will have associated gas treatment capacity of 540 million cubic feet per day and water injection capacity of 350,000 barrels per day.
Contractors
- Modec: Front End Engineering and Design
Status
- Planned
History
- 2022 - Modec awarded Front End Engineering and Design
Other Information
- -