Difference between revisions of "Eemshaven LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 10: | Line 10: | ||
* The terminal will consist of two floating storage and regasification units (FSRU) and a jetty. | * The terminal will consist of two floating storage and regasification units (FSRU) and a jetty. | ||
* The vessels are Golar Igloo and the Eemshaven LNG installation | * The vessels are Golar Igloo and the Eemshaven LNG installation | ||
+ | * The incoming boats transporting LNG will moor ship-to-ship to the Golar Igloo for unloading | ||
+ | * A new underground gas pipeline has been laid from the quay to Gasunie's existing network. | ||
=== Technical Details === | === Technical Details === | ||
Line 17: | Line 19: | ||
* Send out capacity: | * Send out capacity: | ||
* Constructor: | * Constructor: | ||
+ | ** New Fortress Energy: Golar Igloo | ||
+ | ** Exmar: Eemshaven LNG installation | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
Line 31: | Line 35: | ||
* 2022 - All capacity for the terminal was sold out | * 2022 - All capacity for the terminal was sold out | ||
+ | * 2022 - The terminal begaon operations | ||
+ | * 2023 - Gasunie started a feasibility study on capacity expansion | ||
=== Other Information === | === Other Information === | ||
Line 40: | Line 46: | ||
# [https://lng-news.blogspot.com/2022/08/eemsenergyterminal-in-eemshaven.html EemsEnergyTerminal in Eemshaven completely 'sold out’: ENGIE becoming its new shipper] | # [https://lng-news.blogspot.com/2022/08/eemsenergyterminal-in-eemshaven.html EemsEnergyTerminal in Eemshaven completely 'sold out’: ENGIE becoming its new shipper] | ||
# [https://lng-news.blogspot.com/2022/09/eemsenergyterminals-fsrus-have-arrived.html EemsEnergyTerminal's FSRUs have arrived in Eemshaven] | # [https://lng-news.blogspot.com/2022/09/eemsenergyterminals-fsrus-have-arrived.html EemsEnergyTerminal's FSRUs have arrived in Eemshaven] | ||
+ | # [https://lng-news.blogspot.com/2022/09/first-natural-gas-available-from-new.html First natural gas available from new floating LNG terminal in Eemshaven in mid-September] | ||
+ | # [https://abarrelfull.blogspot.com/2023/02/eemsenergyterminal-for-lng-out-of.html EemsEnergyTerminal for LNG out of the starting blocks] | ||
+ | # [https://lng-news.blogspot.com/2023/02/continuing-study-to-expand-lng-capacity.html Continuing study to expand LNG capacity at Eemshaven and Maasvlakte; additional Terneuzen terminal not feasible] | ||
+ | |||
[[category:LNG]] | [[category:LNG]] | ||
[[category:Netherlands]] | [[category:Netherlands]] | ||
+ | [[category:Gasunie]] |
Latest revision as of 15:42, 18 February 2023
Contents
Summary Information
- Ownership: EemsEnergyTerminal (Gasunie)
- Website: https://www.eemsenergyterminal.nl/
- Location: Eemshaven port, Groningen province
- Capacity: 6.0 million tons/annum
- Status: Under construction
Brief Description
- The terminal will consist of two floating storage and regasification units (FSRU) and a jetty.
- The vessels are Golar Igloo and the Eemshaven LNG installation
- The incoming boats transporting LNG will moor ship-to-ship to the Golar Igloo for unloading
- A new underground gas pipeline has been laid from the quay to Gasunie's existing network.
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
- New Fortress Energy: Golar Igloo
- Exmar: Eemshaven LNG installation
Ongoing Projects/Project Status
- The terminal is expected to start operations later in 2022
Suppliers / Customers
- Suppliers:
- Customers:
- From Eemshaven, Gasunie will continue to ensure the onward transport of gas in the Netherlands via the national gas pipeline network.
- Engie will buy 1 BCM per annum
History
- 2022 - All capacity for the terminal was sold out
- 2022 - The terminal begaon operations
- 2023 - Gasunie started a feasibility study on capacity expansion
Other Information
-
Links
- Gasunie charters floating LNG terminal
- Second floating LNG facility contracted for Eemshaven
- EemsEnergyTerminal in Eemshaven completely 'sold out’: ENGIE becoming its new shipper
- EemsEnergyTerminal's FSRUs have arrived in Eemshaven
- First natural gas available from new floating LNG terminal in Eemshaven in mid-September
- EemsEnergyTerminal for LNG out of the starting blocks
- Continuing study to expand LNG capacity at Eemshaven and Maasvlakte; additional Terneuzen terminal not feasible