Difference between revisions of "Hamina LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: * Website: * Location: * Capacity: million tons/annum * Status: === Brief Description === === Technical Details === * Storage...") |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: Hamina LNG |
− | * Website: | + | * Website: https://www.haminalng.fi/ |
* Location: | * Location: | ||
* Capacity: million tons/annum | * Capacity: million tons/annum | ||
* Status: | * Status: | ||
=== Brief Description === | === Brief Description === | ||
− | + | * A small scale onshore LNG terminal | |
=== Technical Details === | === Technical Details === | ||
− | * Storage capacity: | + | * Storage capacity: 30,000m3 |
* Unloading capacity: | * Unloading capacity: | ||
* Send out capacity: | * Send out capacity: | ||
− | * Constructor: | + | * Constructor: |
+ | ** Wärtsilä: site filling, soil refurbishment, civil works, infrastructure, full containment storage tank with a combined net volume of 30 000 m3, regasification and gas metering, BOG (boil-off gas handling) system, electrical and control system, unloading, loading system and bunkering and truck loading | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
Line 26: | Line 27: | ||
=== History === | === History === | ||
− | * | + | * 2017 - Wärtsilä awarded a turn-key contract for the project |
+ | * 2022 - The terminal entered service | ||
=== Other Information === | === Other Information === | ||
Line 32: | Line 34: | ||
- | - | ||
=== Links === | === Links === | ||
− | # | + | # [https://abarrelfull.blogspot.com/2023/02/wartsila-signs-contract-to-supply-lng.html Wärtsilä signs a contract to supply LNG terminal to Finland] |
+ | # [https://abarrelfull.blogspot.com/2023/02/hamina-lng-oy-has-started-commercial.html Hamina LNG Oy has started commercial operations] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:Finland]] | [[category:Finland]] |
Latest revision as of 14:40, 4 February 2023
Contents
Summary Information
- Ownership: Hamina LNG
- Website: https://www.haminalng.fi/
- Location:
- Capacity: million tons/annum
- Status:
Brief Description
- A small scale onshore LNG terminal
Technical Details
- Storage capacity: 30,000m3
- Unloading capacity:
- Send out capacity:
- Constructor:
- Wärtsilä: site filling, soil refurbishment, civil works, infrastructure, full containment storage tank with a combined net volume of 30 000 m3, regasification and gas metering, BOG (boil-off gas handling) system, electrical and control system, unloading, loading system and bunkering and truck loading
Ongoing Projects/Project Status
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2017 - Wärtsilä awarded a turn-key contract for the project
- 2022 - The terminal entered service
Other Information
-