Difference between revisions of "Nigeria FLNG Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: * Website: * Location: * Capacity: million tons/annum * Status: (In Operation / Planned / Under Construction) === Brief Descrip...") |
Abarrelfull (talk | contribs) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: UTM Offshore Limited & NNPC |
− | * Website: | + | * Website: https://www.utmoffshore.com/ |
* Location: | * Location: | ||
− | * Capacity: million tons/annum | + | * Capacity: 1.2 million tons/annum |
− | * Status: | + | * Status: Planned |
=== Brief Description === | === Brief Description === | ||
− | * - | + | * The floating LNG Terminal shall have an LNG production capacity of 1.2 mmtpa, Turret and Mooring System, Gas pre-treatment modules, LNG production modules, living quarters, self-contained power generation and utilities as well as capacities for LNG storage and offloading. |
=== Technical Details === | === Technical Details === | ||
* Storage capacity: | * Storage capacity: | ||
− | * Constructor: | + | * Constructor: KBR - due diligence review of the Pre-Front End Engineering Design |
* Licensor: | * Licensor: | ||
Line 19: | Line 19: | ||
=== Suppliers / Customers === | === Suppliers / Customers === | ||
− | * Suppliers: | + | * Suppliers: Gas is to be supplied by the [[Yoho Oil and Gas Field]] |
− | * Customers: | + | * Customers: |
=== History === | === History === | ||
− | * - | + | * 2021 - JGC awarded pre-FEED contract |
+ | * 2022 - JGC awarded FEED contract | ||
=== Other Information === | === Other Information === | ||
− | * | + | * The UTM FLNG would target the processing of associated gas currently flared in order to cut carbon emissions and monetise additional reserves |
− | === | + | === Links === |
− | # | + | # [https://abarrelfull.blogspot.com/2021/11/kbr-awarded-contract-to-support.html KBR Awarded Contract to Support Nigeria’s Future Energy Ambitions] |
+ | # [https://abarrelfull.blogspot.com/2021/11/jgc-awarded-pre-feed-contract-for-first.html JGC awarded Pre-FEED Contract for first FLNG facility in Nigeria] | ||
+ | # [https://abarrelfull.blogspot.com/2023/01/jgc-awarded-feed-contract-for-floating.html JGC Awarded FEED Contract for Floating LNG Project in Nigeria] | ||
+ | |||
+ | [[category:LNG]] | ||
+ | [[category:Nigeria]] |
Latest revision as of 15:01, 21 January 2023
Contents
Summary Information
- Ownership: UTM Offshore Limited & NNPC
- Website: https://www.utmoffshore.com/
- Location:
- Capacity: 1.2 million tons/annum
- Status: Planned
Brief Description
- The floating LNG Terminal shall have an LNG production capacity of 1.2 mmtpa, Turret and Mooring System, Gas pre-treatment modules, LNG production modules, living quarters, self-contained power generation and utilities as well as capacities for LNG storage and offloading.
Technical Details
- Storage capacity:
- Constructor: KBR - due diligence review of the Pre-Front End Engineering Design
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 202X
Suppliers / Customers
- Suppliers: Gas is to be supplied by the Yoho Oil and Gas Field
- Customers:
History
- 2021 - JGC awarded pre-FEED contract
- 2022 - JGC awarded FEED contract
Other Information
- The UTM FLNG would target the processing of associated gas currently flared in order to cut carbon emissions and monetise additional reserves