Difference between revisions of "Pengerang Johor RAPID Refinery"

From A Barrel Full
Jump to navigation Jump to search
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
* Ownership: Petronas
+
* Ownership: Petronas / Saudi Aramco
 
* Website: http://www.petronas.com.my/
 
* Website: http://www.petronas.com.my/
 
** List of [[Petronas Refineries]]
 
** List of [[Petronas Refineries]]
 +
** List of [[Saudi Aramco Refineries]]
 
* Location: Pengerang, Johor, Malaysia  
 
* Location: Pengerang, Johor, Malaysia  
 
* Capacity: 15 million tons/annum & 300,000 bbl/day  
 
* Capacity: 15 million tons/annum & 300,000 bbl/day  
Line 13: Line 14:
 
=== Refining Units ===
 
=== Refining Units ===
 
* Atmospheric distillation
 
* Atmospheric distillation
* residual oil hydrotreatment
+
* Residual oil hydrotreatment
 
* Hydrotreating units
 
* Hydrotreating units
 
* Catalytic Reforming Unit
 
* Catalytic Reforming Unit
Line 31: Line 32:
 
* It supplies feedstock for the petrochemical complex. It also produces a host of refined petroleum products, including gasoline and diesel that meet the Euro 4 and Euro 5 fuel specifications
 
* It supplies feedstock for the petrochemical complex. It also produces a host of refined petroleum products, including gasoline and diesel that meet the Euro 4 and Euro 5 fuel specifications
 
=== Ongoing Projects ===
 
=== Ongoing Projects ===
*  
+
* The refinery was commissioned in [[Refinery Projects completed 2019 | 2019]]
 +
* See [[Pengerang Johor Refinery Project]] for details
 +
 
 
=== Other Information ===
 
=== Other Information ===
 
* -
 
* -
 
=== History ===
 
=== History ===
 
* 2011 - The project is announced  
 
* 2011 - The project is announced  
* 2012 - Project officially launched by the Sultan of Johor
+
* 2012 - Project officially launched by the Sultan of Johor
 +
* 2015 - Lease signed for use of land
 +
* 2018 - Saudi Aramco acquired a 50% stake in the refinery
 
* 2018 - First oil cargo arrived at the refinery
 
* 2018 - First oil cargo arrived at the refinery
 
* 2019 - Refinery completed
 
* 2019 - Refinery completed
Line 42: Line 47:
 
=== Links ===
 
=== Links ===
 
# [http://killajoules.wikidot.com/blog:2524 Sultan Of Johor Launches Petronas' Refinery And Petrochemical Integrated Project]
 
# [http://killajoules.wikidot.com/blog:2524 Sultan Of Johor Launches Petronas' Refinery And Petrochemical Integrated Project]
 +
# [https://abarrelfull.blogspot.com/2022/06/ssi-johor-signs-lease-agreements-with.html SSI Johor Signs Lease Agreements with PT-2 and PLNG-2]
 +
# [https://abarrelfull.blogspot.com/2023/01/petronas-saudi-aramco-announce.html PETRONAS, Saudi Aramco announce formation of two new joint ventures in Malaysia]
 
# [https://abarrelfull.blogspot.com/2021/03/malaysia-mega-refinery-project-receives.html Malaysia mega-refinery project receives first crude oil cargo]
 
# [https://abarrelfull.blogspot.com/2021/03/malaysia-mega-refinery-project-receives.html Malaysia mega-refinery project receives first crude oil cargo]
 +
 +
[[Category:Refinery]]
 +
[[Category:Malaysia]]
 +
[[Category:Petronas]]
 +
[[Category:Saudi Aramco]]

Latest revision as of 17:32, 19 January 2023

Summary Information

Brief Description

  • a high complexity crude oil refinery with a capacity of 300,000 barrels a day, a naphtha cracker, petrochemicals and polymer facilities

Refining Units

  • Atmospheric distillation
  • Residual oil hydrotreatment
  • Hydrotreating units
  • Catalytic Reforming Unit
  • Hydrogen Production Units
  • Saturated Gas Plant

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • It will process imported crude
  • The first cargo was from Saudi Arabia

Products Produced

  • It supplies feedstock for the petrochemical complex. It also produces a host of refined petroleum products, including gasoline and diesel that meet the Euro 4 and Euro 5 fuel specifications

Ongoing Projects

Other Information

  • -

History

  • 2011 - The project is announced
  • 2012 - Project officially launched by the Sultan of Johor
  • 2015 - Lease signed for use of land
  • 2018 - Saudi Aramco acquired a 50% stake in the refinery
  • 2018 - First oil cargo arrived at the refinery
  • 2019 - Refinery completed

Links

  1. Sultan Of Johor Launches Petronas' Refinery And Petrochemical Integrated Project
  2. SSI Johor Signs Lease Agreements with PT-2 and PLNG-2
  3. PETRONAS, Saudi Aramco announce formation of two new joint ventures in Malaysia
  4. Malaysia mega-refinery project receives first crude oil cargo