Line 14: | Line 14: | ||
=== Contractors === | === Contractors === | ||
− | * | + | * Aker Solutions |
+ | ** Engineering, procurement, construction, and installation (EPCI) work for topside modifications | ||
+ | ** Subsea production system as well as umbilicals and direct electrical heating (DEH) systems | ||
=== History === | === History === | ||
Line 26: | Line 28: | ||
# [https://factpages.npd.no/en/field/pageview/all/40867462 NPD] | # [https://factpages.npd.no/en/field/pageview/all/40867462 NPD] | ||
# [https://abarrelfull.blogspot.com/2023/01/conocophillips-skandinavia-as-submits.html ConocoPhillips Skandinavia AS Submits Tommeliten A Plan for Development and Operation] | # [https://abarrelfull.blogspot.com/2023/01/conocophillips-skandinavia-as-submits.html ConocoPhillips Skandinavia AS Submits Tommeliten A Plan for Development and Operation] | ||
+ | # [https://abarrelfull.blogspot.com/2023/01/aker-solutions-wins-topside.html Aker Solutions Wins Topside Modification Contract for ConocoPhillips’ Tommeliten Alpha Development] | ||
# [https://abarrelfull.blogspot.com/2023/01/tommeliten-plan-for-development-and.html Tommeliten A Plan for Development and Operation Approved] | # [https://abarrelfull.blogspot.com/2023/01/tommeliten-plan-for-development-and.html Tommeliten A Plan for Development and Operation Approved] | ||
Revision as of 12:50, 10 January 2023
Summary Information
- Operator: ConocoPhillips
- Country: Norway
- Location: southern part of the Norwegian sector in the North Sea
- Production start: Expected 2024
- Partners: PGNiG - 42.2%, ConocoPhillips 49.2%, TotalEnergies 20.2%, Vår Energi 9.1%
- Type: Oil / Gas
- Estimated Reserves: 80-180 million barrels oil equivalent
- Production Volume:
Description
- The field is located on the border to the UK sector and the Norwegian share of the field is 99.57 per cent. The water depth is 75 metres. Tommeliten A was proven in 1977 and the plan for development and operation (PDO) was approved in July 2022.
- The development concept is a two-by-six slot subsea production system (SPS) with ten production wells and an electrically heated flowline, tied into the Ekofisk Complex, including installation of a new processing module.
Contractors
- Aker Solutions
- Engineering, procurement, construction, and installation (EPCI) work for topside modifications
- Subsea production system as well as umbilicals and direct electrical heating (DEH) systems
History
- 1977 - Tommeliten A discovered
- 2022 - PDO granted
Geology
- The reservoir contains gas condensate and volatile oil in chalk in the Paleocene Ekofisk Formation and Upper Cretaceous Tor Formation at a depth of about 3000 metres. The reservoir qualities vary across both formations and are affected by faults and fractures