Difference between revisions of "Commonwealth LNG Export Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 13: | Line 13: | ||
* Storage capacity: | * Storage capacity: | ||
* Constructor: | * Constructor: | ||
+ | ** Arup: specialist engineering services for the modular LNG storage tanks | ||
* Licensor: | * Licensor: | ||
Line 32: | Line 33: | ||
# [https://commonwealthlng.com/project/ Project page] | # [https://commonwealthlng.com/project/ Project page] | ||
# [https://www.energy.gov/fecm/articles/commonwealth-lng-llc-fe-dkt-no-19-134-lng Commonwealth LNG, LLC - FE Dkt. No. - 19-134-LNG] | # [https://www.energy.gov/fecm/articles/commonwealth-lng-llc-fe-dkt-no-19-134-lng Commonwealth LNG, LLC - FE Dkt. No. - 19-134-LNG] | ||
+ | # [https://abarrelfull.blogspot.com/2022/11/arup-appointed-to-advise-on-industry.html Arup appointed to advise on industry first LNG modular tank design] | ||
# [https://abarrelfull.blogspot.com/2022/11/commonwealth-lng-launches-tender-for.html Commonwealth LNG Launches Tender for LNG Offtake] | # [https://abarrelfull.blogspot.com/2022/11/commonwealth-lng-launches-tender-for.html Commonwealth LNG Launches Tender for LNG Offtake] | ||
Revision as of 10:14, 21 November 2022
Contents
Summary Information
- Ownership: Commonwealth LNG
- Website:
- Location:
- Capacity: 8.4 million tons/annum
- Status: / Planned
Brief Description
- Commonwealth LNG is an 8.4 mtpa LNG liquefaction and export facility located on the west bank of the Calcasieu Ship Channel at the mouth of the Gulf of Mexico near Cameron, Louisiana. The facility will have six 50,000 M3 modular storage tanks and will be able to accommodate vessels up to 216,000 M3. Gas supply is achieved with the addition of a 3.0-mile pipeline interconnected to two major pipeline systems with significant excess transportation capacity.
Technical Details
- Storage capacity:
- Constructor:
- Arup: specialist engineering services for the modular LNG storage tanks
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 2026
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2019 - Application made for export licence
- 2021 - Tender launched for sale of LNG
Other Information
- -