Difference between revisions of "Balticconnector"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Source: | + | * Source: Inkoo, Finland |
− | * Destination: | + | * Destination: Paldiski, Estonia |
* Ownership: Gasgrid Finland & Elering | * Ownership: Gasgrid Finland & Elering | ||
* Website: | * Website: | ||
Line 18: | Line 18: | ||
=== Other Information === | === Other Information === | ||
− | * | + | * 75% of the EUR 250 million project was funded from the EU’s Connecting Europe Facility (CEF) |
=== Links === | === Links === | ||
# [https://abarrelfull.blogspot.com/2022/06/finnish-estonian-cooperation-secured.html Finnish-Estonian Cooperation Secured Successful Commissioning of Balticconnector] | # [https://abarrelfull.blogspot.com/2022/06/finnish-estonian-cooperation-secured.html Finnish-Estonian Cooperation Secured Successful Commissioning of Balticconnector] |
Latest revision as of 16:41, 20 June 2022
Summary Information
- Source: Inkoo, Finland
- Destination: Paldiski, Estonia
- Ownership: Gasgrid Finland & Elering
- Website:
- Length: 153 kilometres ( miles)
- Capacity: The total transmission capacity of Balticconnector is 7.2 million cubic meters per day
- Status: Operating
Details
- Balticconnector sea section from Paldiskist to Inkoon in Finland is 77 km. Mainland part in Estonia is 55 and in Finland 21 km.
History
- 2019 - The pipeline was commissioned
Other Information
- 75% of the EUR 250 million project was funded from the EU’s Connecting Europe Facility (CEF)