Difference between revisions of "Energia Costa Azul LNG Export Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 33: | Line 33: | ||
=== Links === | === Links === | ||
# [[LNG Terminals Using Air Products Technology]] | # [[LNG Terminals Using Air Products Technology]] | ||
+ | # [https://abarrelfull.blogspot.com/2021/12/sempra-energy-units-sign-three-heads-of.html Sempra Energy Units Sign Three Heads Of Agreements With Total S.A., Mitsui & Co., Tokyo Gas Co. For Energía Costa Azul Liquefaction Project ] | ||
# [https://abarrelfull.blogspot.com/2021/12/air-products-lng-technology-selected.html Air Products’ LNG Technology Selected for Energia Costa Azul Export Project in Mexico] | # [https://abarrelfull.blogspot.com/2021/12/air-products-lng-technology-selected.html Air Products’ LNG Technology Selected for Energia Costa Azul Export Project in Mexico] | ||
# [https://abarrelfull.blogspot.com/2021/12/sempra-energy-announces-fid-for.html Sempra Energy Announces FID For Landmark Energía Costa Azul LNG Export Project] | # [https://abarrelfull.blogspot.com/2021/12/sempra-energy-announces-fid-for.html Sempra Energy Announces FID For Landmark Energía Costa Azul LNG Export Project] | ||
# [https://abarrelfull.blogspot.com/2021/12/technipfmc-receives-notice-to-proceed_15.html TechnipFMC Receives Notice to Proceed for EPC Contract for Sempra LNG’s and IEnova’s Energía Costa Azul LNG Facility] | # [https://abarrelfull.blogspot.com/2021/12/technipfmc-receives-notice-to-proceed_15.html TechnipFMC Receives Notice to Proceed for EPC Contract for Sempra LNG’s and IEnova’s Energía Costa Azul LNG Facility] |
Revision as of 16:16, 15 December 2021
Contents
Summary Information
- Ownership: Sempra
- Website: https://www.ecalng.com/
- Location: Baja California
- Capacity: 3.5 million tons/annum
- Status: Under Construction
Brief Description
- The project will convert Costa Azul LNG into a liquefaction terminal
- ECA LNG Phase 1 will be built as a single-train liquefaction facility with a nameplate capacity of 3.25 million tonnes per annum (Mtpa) of LNG
- Further expansion phases are planned
Technical Details
- Storage capacity:
- Constructor:
- TechnipFMC - FEED and Engineering, Procurement, and Construction (EPC)
- Licensor: Air Products
Ongoing Projects/Project Status
- Commissioning is expected in 2024
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2020 - Project achieved FID
Other Information
- -
Links
- LNG Terminals Using Air Products Technology
- Sempra Energy Units Sign Three Heads Of Agreements With Total S.A., Mitsui & Co., Tokyo Gas Co. For Energía Costa Azul Liquefaction Project
- Air Products’ LNG Technology Selected for Energia Costa Azul Export Project in Mexico
- Sempra Energy Announces FID For Landmark Energía Costa Azul LNG Export Project
- TechnipFMC Receives Notice to Proceed for EPC Contract for Sempra LNG’s and IEnova’s Energía Costa Azul LNG Facility