Difference between revisions of "Barossa FPSO"

From A Barrel Full
Jump to navigation Jump to search
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
  
* Name:  
+
* Name: Barossa FPSO
* Field:  
+
* Field: [[Barossa Area Oil and Gas Field Development]]
* Country:  
+
* Country: Australia
 
* Ownership:  
 
* Ownership:  
 
* Website:  
 
* Website:  
* Field Operated By:
+
* Field Operated By: Santos
 
* Capacity:  bpd  
 
* Capacity:  bpd  
* Year of Completion:  
+
* Year of Completion: Expected 2023
  
 
=== Brief Description ===
 
=== Brief Description ===
  
* -
+
* The Barossa FPSO is MODEC's largest size of "Gas FPSO" to date, which will be able to export over 600 million standard cubic feet of gas per day as well as store up to 650,000 barrels of condensate for export. It has been designed to withstand a 100-year cyclone event at a water depth of 260 meters and located some 300 kilometers off north of Darwin, Australia.
 +
* The FPSO will be permanently moored by an internal turret mooring system
  
 
=== Contractors ===
 
=== Contractors ===
* MODEC:  
+
* '''MODEC: '''
** Front End Engineering Design (FEED) contract for the [[Barossa FPSO]]
+
** Front End Engineering Design (FEED) contract for the Barossa FPSO
 
** Engineering, Procurement, Construction and Installation (EPCI) of the Barossa FPSO, including topsides processing equipment as well as hull and marine systems.
 
** Engineering, Procurement, Construction and Installation (EPCI) of the Barossa FPSO, including topsides processing equipment as well as hull and marine systems.
 +
* '''SOFEC, Inc'''
 +
** internal turret mooring system
  
 
=== Status ===
 
=== Status ===
* -
+
* Under construction
  
 
=== History ===
 
=== History ===
* -
+
* 2018 - Modec awarded FEED
 +
* 2019 - Modec awarded Engineering, Procurement, Construction and Installation (EPCI) contract
  
 
=== Other Information ===
 
=== Other Information ===
Line 31: Line 35:
 
=== Links ===
 
=== Links ===
  
 +
# [https://abarrelfull.blogspot.com/2021/12/modec-awarded-feed-contract-of-fpso-for.html MODEC Awarded FEED Contract of an FPSO for Barossa Offshore Project]
 
# [https://abarrelfull.blogspot.com/2021/12/modec-awarded-contract-to-supply-fpso.html MODEC Awarded Contract to Supply FPSO for Barossa Field offshore Australia by ConocoPhillips]
 
# [https://abarrelfull.blogspot.com/2021/12/modec-awarded-contract-to-supply-fpso.html MODEC Awarded Contract to Supply FPSO for Barossa Field offshore Australia by ConocoPhillips]

Latest revision as of 14:42, 8 December 2021

Summary Information

Brief Description

  • The Barossa FPSO is MODEC's largest size of "Gas FPSO" to date, which will be able to export over 600 million standard cubic feet of gas per day as well as store up to 650,000 barrels of condensate for export. It has been designed to withstand a 100-year cyclone event at a water depth of 260 meters and located some 300 kilometers off north of Darwin, Australia.
  • The FPSO will be permanently moored by an internal turret mooring system

Contractors

  • MODEC:
    • Front End Engineering Design (FEED) contract for the Barossa FPSO
    • Engineering, Procurement, Construction and Installation (EPCI) of the Barossa FPSO, including topsides processing equipment as well as hull and marine systems.
  • SOFEC, Inc
    • internal turret mooring system

Status

  • Under construction

History

  • 2018 - Modec awarded FEED
  • 2019 - Modec awarded Engineering, Procurement, Construction and Installation (EPCI) contract

Other Information

  • -

Links

  1. MODEC Awarded FEED Contract of an FPSO for Barossa Offshore Project
  2. MODEC Awarded Contract to Supply FPSO for Barossa Field offshore Australia by ConocoPhillips