Difference between revisions of "Barossa FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 16: | Line 16: | ||
=== Contractors === | === Contractors === | ||
− | * MODEC: | + | * '''MODEC: ''' |
** Front End Engineering Design (FEED) contract for the [[Barossa FPSO]] | ** Front End Engineering Design (FEED) contract for the [[Barossa FPSO]] | ||
** Engineering, Procurement, Construction and Installation (EPCI) of the Barossa FPSO, including topsides processing equipment as well as hull and marine systems. | ** Engineering, Procurement, Construction and Installation (EPCI) of the Barossa FPSO, including topsides processing equipment as well as hull and marine systems. | ||
+ | * '''SOFEC, Inc''' | ||
+ | ** internal turret mooring system | ||
=== Status === | === Status === |
Revision as of 14:38, 8 December 2021
Contents
Summary Information
- Name: Barossa FPSO
- Field: Barossa Area Oil and Gas Field Development
- Country: Australia
- Ownership:
- Website:
- Field Operated By: Santos
- Capacity: bpd
- Year of Completion: Expected 2023
Brief Description
- The Barossa FPSO is MODEC's largest size of "Gas FPSO" to date, which will be able to export over 600 million standard cubic feet of gas per day as well as store up to 650,000 barrels of condensate for export. It has been designed to withstand a 100-year cyclone event at a water depth of 260 meters and located some 300 kilometers off north of Darwin, Australia.
- The FPSO will be permanently moored by an internal turret mooring system
Contractors
- MODEC:
- Front End Engineering Design (FEED) contract for the Barossa FPSO
- Engineering, Procurement, Construction and Installation (EPCI) of the Barossa FPSO, including topsides processing equipment as well as hull and marine systems.
- SOFEC, Inc
- internal turret mooring system
Status
- -
History
- -
Other Information
- -