Difference between revisions of "Chiba Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) (→Links) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
* Website: http://www.cosmo-oil.co.jp/ | * Website: http://www.cosmo-oil.co.jp/ | ||
* Location: Chiba, Japan | * Location: Chiba, Japan | ||
− | * Capacity: | + | * Capacity: 7.9 million tons/annum & 177,000 bbl/day |
* Nelson Complexity: | * Nelson Complexity: | ||
* Refining Depth: | * Refining Depth: | ||
=== Refining Units === | === Refining Units === | ||
− | * Atmospheric Distillation | + | * Atmospheric Distillation 75,000 bpd + 102,000 bpd |
* Vacuum Distillation Unit 20,000 bpd + 60,000 bpd | * Vacuum Distillation Unit 20,000 bpd + 60,000 bpd | ||
* Prefractionator Unit 23,000 bpd | * Prefractionator Unit 23,000 bpd | ||
Line 48: | Line 48: | ||
* 2011 - Refinery fire occurs after an earthquake | * 2011 - Refinery fire occurs after an earthquake | ||
* 2012 - Restart of CDU damaged in the fire | * 2012 - Restart of CDU damaged in the fire | ||
+ | * 2017 - Capacity reduced to 177,000 | ||
=== Links === | === Links === | ||
# [http://www.cosmo-oil.co.jp/eng/company/chiba.html Refinery Webpage] | # [http://www.cosmo-oil.co.jp/eng/company/chiba.html Refinery Webpage] | ||
Line 64: | Line 65: | ||
# [http://killajoules.wikidot.com/blog:2390 Preparations to Resume Operation of the #1 CDU at Chiba Refinery Following Completion of the Safety Inspection] | # [http://killajoules.wikidot.com/blog:2390 Preparations to Resume Operation of the #1 CDU at Chiba Refinery Following Completion of the Safety Inspection] | ||
# [http://killajoules.wikidot.com/blog:4415 Cosmo Oil, Implementation of Restructuring of Refinery Supply] | # [http://killajoules.wikidot.com/blog:4415 Cosmo Oil, Implementation of Restructuring of Refinery Supply] | ||
+ | # [http://killajoules.wikidot.com/archive:refining-optimization-cosmo-oil Refining Optimization] | ||
[[Category:Refinery]] | [[Category:Refinery]] | ||
[[Category:Japan]] | [[Category:Japan]] |
Latest revision as of 14:15, 29 March 2020
Contents
Summary Information
- Ownership: Cosmo Oil
- Website: http://www.cosmo-oil.co.jp/
- Location: Chiba, Japan
- Capacity: 7.9 million tons/annum & 177,000 bbl/day
- Nelson Complexity:
- Refining Depth:
Refining Units
- Atmospheric Distillation 75,000 bpd + 102,000 bpd
- Vacuum Distillation Unit 20,000 bpd + 60,000 bpd
- Prefractionator Unit 23,000 bpd
- Catalytic Reforming Unit 11,500 bpd + 25,000 bpd
- Reformate Splitter 9,000 bpd + 20,000 bpd
- Fluid Catalytic Cracking Unit 40,000 bpd
- FCC Gasoline Hydrodesulfurization Unit 24,000 bpd
- Hydrodesulfurization Units 8,000 bpd + 26,000 bpd + 55,000 bpd + 50,000 bpd
- Isomerization Unit 6,000 bpd
- Vacuum Gas Oil Hydrodesulfurization Unit 35,000 bpd
- Hydrogen Recovery by Membranes Separation System Unit 331,200 m³N / day
- Fuel Oil Hydrodesulfurization Unit 36,000 bpd + 36,000 bpd
- No.1 Hydrogen Producing Unit 648,000 m³N / day
- No.10·20 Hydrogen Producing Unit 880,000 m³N / day × 2
- Sulfur Recovery Unit(With Tail Gas Treating Unit) 150 t / day × 3
- Blown Asphalt Unit 3,600 t / month
Terminal Capacity
- Crude Oil: (13units) 930,000kl
- Finished Product /Semi-processed Product Tanks (119units) 1,490,000kl
- Lubricating Oil Tanks (66units) 24,000kl
- Sulfur Tanks (2units) 13,200kl
- Asphalt Tanks (20units) 28,000kl
- LPG Tanks (23units) 52,700kl
Crude Supply
- Crude is primarily supplied from the Middle East, including UAE, S Arabia, Qatar, Iran & Kuwait
Products Produced
- LPG, Gasoline, Diesel, Jet Fuel, Fuel Oil, Asphalt, Sulphur
Projects
-
Other Information
-
History
- 1963 - Refinery commissioned
- 1967 - Asphalt Unit commissioned
- 1969 - Gas Oil Hydrodesulfurization & Hydrogen Units added
- 1977 - Residuum Hydrodesulfurization & Hydrogen Units commissioned
- 2006 - Fire and explosion in the desulfurization unit
- 2010 - Nameplate capacity reduced by 20,000 to 220,000 bbl/day
- 2011 - Refinery fire occurs after an earthquake
- 2012 - Restart of CDU damaged in the fire
- 2017 - Capacity reduced to 177,000
Links
- Refinery Webpage
- Japanese Refining Capacities
- Chiyoda Crude Distillation Units
- Chiyoda Blown Asphalt Bitumen Units
- Chiyoda Residuum Hydrodesulfurization Units
- Chiyoda Vacuum Gas Oil Hydrodesulfurization Units
- Chiyoda Hydrogen Manufacturing Units
- Chiyoda Sulfur Recovery Units
- Chiyoda H2S Removal Units With Amine
- Chiyoda Sour Water Stripping Units
- Reduction of CDU Nameplate Capacity
- Preparations for Start-Up of Crude Distillation Unit (CDU) at Chiba Refinery
- Start-Up of Crude Distillation Unit (CDU) at Chiba Refinery
- Preparations to Resume Operation of the #1 CDU at Chiba Refinery Following Completion of the Safety Inspection
- Cosmo Oil, Implementation of Restructuring of Refinery Supply
- Refining Optimization