Difference between revisions of "Sarroch Refinery Upgrade Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: Saras SPA * Website: http://www.saras.it/ * Wiki Page: Sarroch Refinery * Location: The Southwestern coast of Sardinia * Capacity:...") |
Abarrelfull (talk | contribs) |
||
Line 8: | Line 8: | ||
* Project Stage: Completed 2013 | * Project Stage: Completed 2013 | ||
* Budget: | * Budget: | ||
− | The Project === | + | === The Project === |
* Project Type: Revamp of the Hydrocracker | * Project Type: Revamp of the Hydrocracker | ||
* Project Summary: The revamp's objectives are the upgrade of the mild hydrocracker's capacity, performance and conversion, while achieving a longer catalyst life duration. The revamp includes major modification to the reaction section, including installation of a new pretreat reactor, as well as upgrading the gas compression circuit and installing a new high-pressure amine wash section. | * Project Summary: The revamp's objectives are the upgrade of the mild hydrocracker's capacity, performance and conversion, while achieving a longer catalyst life duration. The revamp includes major modification to the reaction section, including installation of a new pretreat reactor, as well as upgrading the gas compression circuit and installing a new high-pressure amine wash section. | ||
* Main Contractors | * Main Contractors | ||
** Foster Wheeler: engineering, procurement, and construction management | ** Foster Wheeler: engineering, procurement, and construction management | ||
+ | |||
=== Refining Units === | === Refining Units === | ||
Hydrocracker Revamp | Hydrocracker Revamp |
Revision as of 08:39, 17 March 2020
Contents
Summary Information
- Ownership: Saras SPA
- Website: http://www.saras.it/
- Wiki Page: Sarroch Refinery
- Location: The Southwestern coast of Sardinia
- Capacity: million tons/annum & bbl/day
- Nelson Complexity:
- Project Stage: Completed 2013
- Budget:
The Project
- Project Type: Revamp of the Hydrocracker
- Project Summary: The revamp's objectives are the upgrade of the mild hydrocracker's capacity, performance and conversion, while achieving a longer catalyst life duration. The revamp includes major modification to the reaction section, including installation of a new pretreat reactor, as well as upgrading the gas compression circuit and installing a new high-pressure amine wash section.
- Main Contractors
- Foster Wheeler: engineering, procurement, and construction management
Refining Units
Hydrocracker Revamp
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
-
Products Produced
- The project increased diesel production by ~600 ktons/year and refinery runs by ~650 ktons/year
History
- 2008 - Foster Wheeler awarded an engineering, procurement, and construction management contract