Rio Bravo Gas Pipeline

From A Barrel Full
Revision as of 11:44, 13 May 2024 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

  • Source: Agua Dulce
  • Destination: Brownsville, Texas
  • Ownership: Whitewater
  • Website: https://whitewatermidstream.com/
  • Length: kilometres (137 miles)
  • Capacity: 4.5 billion cubic feet per day
  • Status: Planned

Details

  • The project consists of 137-miles of new 42-inch and 48-inch pipelines transporting natural gas from the Agua Dulce supply area to NextDecade's Rio Grande Export Terminal LNG Project in Brownsville, Texas
  • Construction is expected to begin in 2025 and be completed in 2026

History

  • 2024 - Whitewater became a partner in the pipeline

Other Information

  • -

Links

  1. Enbridge to Enter into JV Connecting Permian Basin Natural Gas Supply to Growing LNG and USGC Demand